Residential construction wages: Dukes, Nantucket, Massachusetts

Wage determination MA20260009 · Active · Standard · verify on SAM.gov

DukesNantucket

Get an email when this determination changes.
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 12026-05-18diff vs rev 0
rev 02026-05-17original

Current rates (rev 1)

Download CSV
ClassificationRateFringeTotal
TERRAZZO FINISHER$63.44$37.33$100.77
BOILERMAKER$50.62$28.82$79.44
MARBLE, TILE & TERRAZZO WORKERS$64.52$37.51$102.03
MARBLE & TILE FINISHER$49.32$35.26$84.58
BRICKLAYER, CEMENT MASON, PLASTERER (NEW BEDFORD CHAPTER)$64.50$37.54$102.04
CARPENTERS: (ALL OTHER WORK)$50.10$31.45$81.55
CARPENTER, NEW WOOD FRAME CONSTRUCTION NOT EXCEEDING 4 STORIES INCLUDING BASEMENT: WOOD FRAMING, SIDING AND EXTERIOR TRIM WORK (DUKES COUNTY)$26.55$13.02$39.57
CARPENTER, NEW WOOD FRAME CONSTRUCTION NOT EXCEEDING 4 STORIES INCLUDING BASEMENT: ALL OTHER CARPENTRY WORK ON WOOD FRAME PROJECTS (DUKES COUNTY)$26.55$13.02$39.57
CARPENTER, NEW WOOD FRAME CONSTRUCTION NOT EXCEEDING 4 STORIES INCLUDING BASEMENT: WOOD FRAMING, SIDING AND EXTERIOR TRIM WORK (NANTUCKET COUNTY)$26.55$13.02$39.57
CARPENTER, NEW WOOD FRAME CONSTRUCTION NOT EXCEEDING 4 STORIES INCLUDING BASEMENT: ALL OTHER CARPENTRY WORK ON WOOD FRAME PROJECTS (NANTUCKET COUNTY)$26.55$13.02$39.57
FLOOR LAYER: CARPET$49.18$31.75$80.93
ELECTRICIAN$50.02$31.05$81.07
ELEVATOR MECHANIC$74.17$38.44$112.61
POWER EQUIPMENT OPERATORS: GROUP 6 OILER (ON TRUCK CRANES AND GRADALLS)$30.85$33.70$64.55
POWER EQUIPMENT OPERATORS: GROUP 5 OILER (OTHER THAN TRUCK CRANES AND GRADALLS)$25.02$33.70$58.72
POWER EQUIPMENT OPERATORS: GROUP 4 ASSISTANT ENGINEER (FIREMAN)$46.52$33.70$80.22
POWER EQUIPMENT OPERATORS: GROUP 3 PUMPS (1-3 GROUPED); COMPRESSOR; WELDING MACHINE (1-3 GROUPED); GENERATOR; CONCRETE VIBRATOR; HEATER (POWER DRIVEN 1- 5); WELL POINT SYSTEM (OPERATING); SYPHON-PULSOMETER; CONCRETE MIXER; VALVES CONTROLLING PERMANENT PLANT AIR OR STEAM; CONVEYOR; JACKSON TYPE TAMPER; SINGLE DIAPHRAGM PUMP; LIGHTING PLANT$37.02$33.70$70.72
POWER EQUIPMENT OPERATORS: GROUP 1 CRANE; SHOVEL; TRUCK CRANE; CHERRY PICKER; DRAGLINE; TRENCH HOE; BACKHOE; THREE DRUM MACHINE; DERRICK; PILE DRIVER; ELEVATOR TOWER; HOIST; GRADALL; SHOVEL DOZER; FRONT END LOADER; FORK LIFT; BORING MACHINE; ROTARY DRILL; POST HOLE HAMMER; POST HOLE DIGGER; PUMPCRETE MACHINE; ASPHALT PLANT (ON SITE); CONCRETE BATCHING AND/OR MIXING PLANT (ON SITE); CRUSHER PLANT (ON SITE); PAVING CONCRETE MIXER; TIMBER JACK$57.83$33.70$91.53
POWER EQUIPMENT OPERATORS: OOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON,S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB): OVER 150 FT. +2.18 OVER 185 FT. +3.84 OVER 210 FT. +5.39 OVER 250 FT. +8.16 OVER 295 FT. +11.29 OVER 350 FT. +13.14$57.18$33.70$90.88
IRONWORKER$43.03$33.53$76.56
LABORERS: GROUP 7 FLAGGERS$27.01$29.70$56.71
LABORERS: GROUP 6 ASBESTOS REMOVAL LABORERS$46.10$29.70$75.80
LABORERS: GROUP 5 PRE-CAST FLOOR AND ROOF PLANK ERECTOR$38.95$29.70$68.65
LABORERS: GROUP 4 BLASTER; POWDERMAN$38.95$29.70$68.65
LABORERS: GROUP 3 AIR TRACK, BLOCK PAVER; RUMMER; CURB SETTER; HYDRAULIC AND SIMILAR SELF POWERED DRILLS$38.95$29.70$68.65
LABORERS: GROUP 2 JACKHAMMER OPERATOR; PAVEMENT BREAKER; ASPHAL RAKER CARBIDE CORE DRILLING MACHINE; CHAIN SAW OPERTOR; PIPELAYER; BARCO TYPE JUMPING TAMPERS; LASER BEAM; CONCRETE PUMP; MASON TENDER; MOTORIZED MORTAR MIXER; RIDE-ON MOTORIZED BUGGY; FENCE AND BEAM RAIL ERECTOR$38.95$29.70$68.65
LABORERS: GROUP 1 LABORERS; CARPENTER TENDERS$38.95$29.70$68.65
LABORERS:, WRECKING: GROUP 6 ASBESTOS, LEAD PAINT, TOXIC AND HAZARDOUS WASTE$46.25$29.70$75.95
LABORERS:, WRECKING: GROUP 5 YARDMAN, BURNERS, SAWYERS$45.35$29.70$75.05
LABORERS:, WRECKING: GROUP 4 YARDMAN (SALVAGE YARD ONLY)$42.25$29.70$71.95
LABORERS:, WRECKING: GROUP 3 SMALL BACKHOES, LOADERS ON TRACKS, BOBCAT TYPE LOADERS, HYDRAULIC "BROCK" TYPE HAMMER OPERATORS, CONCRETE CUTTING SAWS$47.25$29.70$76.95
LABORERS:, WRECKING: GROUP 2 BURNERS, JACKHAMMERS$47.00$29.70$76.70
LABORERS:, WRECKING: GROUP 1 ADZEMAN, WRECKING LABORER$46.25$29.70$75.95
GLAZIER$43.13$21.00$64.13
PAINTERS: SPRAY, SANDBLAST (REPAINT)$45.72$36.00$81.72
PAINTERS: SPRAY, SANDBLAST (NEW CONSTRUCTION)$47.66$36.00$83.66
PAINTERS: BRUSH, TAPER (REPAINT)$44.32$36.00$80.32
PAINTERS: BRUSH, TAPER (NEW CONSTRUCTION)$46.26$36.00$82.26
PLUMBERS AND PIPEFITTERS$52.49$33.60$86.09
ROOFERS: (ALL TEAR-OFF AND/OR REMOVAL OF ANY TYPES OF ROOFING AND ALL SPUDDING, SWEEPING, VACUUMING AND/OR CLEANUP OF ANY AND ALL AREAS OF ANY TYPE WHERE A ROOF IS TO BE RELAID)$53.53$35.69$89.22
SPRINKLER FITTER (BARNSTABLE; BRISTOL (BEYOND 35 MI RADIUS OF BOSTON CITY HALL); DUKES; MIDDLESEX (ASHBY, TOWNSEND, THE AREA OF PEPPERELL AND SHIRLEY BEYOND 35 MI RADIUS OF BOSTON CITY HALL); NANTUCKET; PLYMOUTH (BEYOND 35 MI RADIUS OF BOSTON CITY HALL))$49.70$29.75$79.45
SPRINKLER FITTER$49.70$29.75$79.45
TRUCK DRIVERS: GROUP 7 TRAILERS FOR EARTH MOVING EQUIPMENT (DOUBLE HOOKUP) POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM$41.82$37.35$79.17
TRUCK DRIVERS: GROUP 6 SPECIALIZED EARTH MOVING EQUIPMENT OVER 35 TONS POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM$41.53$37.35$78.88
TRUCK DRIVERS: GROUP 5 SPECIALIZED EARTH MOVING EQUIPMENT UNDER 35 TONS OTHER THAN CONVENTIONAL TYPE TRUCKS; LOW BED; VACHUAL; MECHANICS, PAVING RESTORATION EQUIPMENT POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM$41.24$37.35$78.59
TRUCK DRIVERS: GROUP 4 FOUR AND FIVE AXLE EQUIPMENT WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM$41.14$37.35$78.49
TRUCK DRIVERS: GROUP 3 THREE AXLE EQUIPMENT AND TIREMAN POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM$41.02$37.35$78.37
TRUCK DRIVERS: GROUP 2 TWO AXLE EQUIPMENT; & FORKLIFT OPERATOR POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM$40.95$37.35$78.30
TRUCK DRIVERS: GROUP 1 STATION WAGONS; PANEL TRUCKS; AND PICKUP TRUCKS POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM$40.78$37.35$78.13