Current rates (rev 1)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TERRAZZO FINISHER | $63.44 | $37.33 | $100.77 |
| BOILERMAKER | $50.62 | $28.82 | $79.44 |
| MARBLE, TILE & TERRAZZO WORKERS | $64.52 | $37.51 | $102.03 |
| MARBLE & TILE FINISHER | $49.32 | $35.26 | $84.58 |
| BRICKLAYER, CEMENT MASON, PLASTERER (NEW BEDFORD CHAPTER) | $64.50 | $37.54 | $102.04 |
| CARPENTERS: (ALL OTHER WORK) | $50.10 | $31.45 | $81.55 |
| CARPENTER, NEW WOOD FRAME CONSTRUCTION NOT EXCEEDING 4 STORIES INCLUDING BASEMENT: WOOD FRAMING, SIDING AND EXTERIOR TRIM WORK (DUKES COUNTY) | $26.55 | $13.02 | $39.57 |
| CARPENTER, NEW WOOD FRAME CONSTRUCTION NOT EXCEEDING 4 STORIES INCLUDING BASEMENT: ALL OTHER CARPENTRY WORK ON WOOD FRAME PROJECTS (DUKES COUNTY) | $26.55 | $13.02 | $39.57 |
| CARPENTER, NEW WOOD FRAME CONSTRUCTION NOT EXCEEDING 4 STORIES INCLUDING BASEMENT: WOOD FRAMING, SIDING AND EXTERIOR TRIM WORK (NANTUCKET COUNTY) | $26.55 | $13.02 | $39.57 |
| CARPENTER, NEW WOOD FRAME CONSTRUCTION NOT EXCEEDING 4 STORIES INCLUDING BASEMENT: ALL OTHER CARPENTRY WORK ON WOOD FRAME PROJECTS (NANTUCKET COUNTY) | $26.55 | $13.02 | $39.57 |
| FLOOR LAYER: CARPET | $49.18 | $31.75 | $80.93 |
| ELECTRICIAN | $50.02 | $31.05 | $81.07 |
| ELEVATOR MECHANIC | $74.17 | $38.44 | $112.61 |
| POWER EQUIPMENT OPERATORS: GROUP 6 OILER (ON TRUCK CRANES AND GRADALLS) | $30.85 | $33.70 | $64.55 |
| POWER EQUIPMENT OPERATORS: GROUP 5 OILER (OTHER THAN TRUCK CRANES AND GRADALLS) | $25.02 | $33.70 | $58.72 |
| POWER EQUIPMENT OPERATORS: GROUP 4 ASSISTANT ENGINEER (FIREMAN) | $46.52 | $33.70 | $80.22 |
| POWER EQUIPMENT OPERATORS: GROUP 3 PUMPS (1-3 GROUPED); COMPRESSOR; WELDING MACHINE (1-3 GROUPED); GENERATOR; CONCRETE VIBRATOR; HEATER (POWER DRIVEN 1- 5); WELL POINT SYSTEM (OPERATING); SYPHON-PULSOMETER; CONCRETE MIXER; VALVES CONTROLLING PERMANENT PLANT AIR OR STEAM; CONVEYOR; JACKSON TYPE TAMPER; SINGLE DIAPHRAGM PUMP; LIGHTING PLANT | $37.02 | $33.70 | $70.72 |
| POWER EQUIPMENT OPERATORS: GROUP 1 CRANE; SHOVEL; TRUCK CRANE; CHERRY PICKER; DRAGLINE; TRENCH HOE; BACKHOE; THREE DRUM MACHINE; DERRICK; PILE DRIVER; ELEVATOR TOWER; HOIST; GRADALL; SHOVEL DOZER; FRONT END LOADER; FORK LIFT; BORING MACHINE; ROTARY DRILL; POST HOLE HAMMER; POST HOLE DIGGER; PUMPCRETE MACHINE; ASPHALT PLANT (ON SITE); CONCRETE BATCHING AND/OR MIXING PLANT (ON SITE); CRUSHER PLANT (ON SITE); PAVING CONCRETE MIXER; TIMBER JACK | $57.83 | $33.70 | $91.53 |
| POWER EQUIPMENT OPERATORS: OOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON,S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB): OVER 150 FT. +2.18 OVER 185 FT. +3.84 OVER 210 FT. +5.39 OVER 250 FT. +8.16 OVER 295 FT. +11.29 OVER 350 FT. +13.14 | $57.18 | $33.70 | $90.88 |
| IRONWORKER | $43.03 | $33.53 | $76.56 |
| LABORERS: GROUP 7 FLAGGERS | $27.01 | $29.70 | $56.71 |
| LABORERS: GROUP 6 ASBESTOS REMOVAL LABORERS | $46.10 | $29.70 | $75.80 |
| LABORERS: GROUP 5 PRE-CAST FLOOR AND ROOF PLANK ERECTOR | $38.95 | $29.70 | $68.65 |
| LABORERS: GROUP 4 BLASTER; POWDERMAN | $38.95 | $29.70 | $68.65 |
| LABORERS: GROUP 3 AIR TRACK, BLOCK PAVER; RUMMER; CURB SETTER; HYDRAULIC AND SIMILAR SELF POWERED DRILLS | $38.95 | $29.70 | $68.65 |
| LABORERS: GROUP 2 JACKHAMMER OPERATOR; PAVEMENT BREAKER; ASPHAL RAKER CARBIDE CORE DRILLING MACHINE; CHAIN SAW OPERTOR; PIPELAYER; BARCO TYPE JUMPING TAMPERS; LASER BEAM; CONCRETE PUMP; MASON TENDER; MOTORIZED MORTAR MIXER; RIDE-ON MOTORIZED BUGGY; FENCE AND BEAM RAIL ERECTOR | $38.95 | $29.70 | $68.65 |
| LABORERS: GROUP 1 LABORERS; CARPENTER TENDERS | $38.95 | $29.70 | $68.65 |
| LABORERS:, WRECKING: GROUP 6 ASBESTOS, LEAD PAINT, TOXIC AND HAZARDOUS WASTE | $46.25 | $29.70 | $75.95 |
| LABORERS:, WRECKING: GROUP 5 YARDMAN, BURNERS, SAWYERS | $45.35 | $29.70 | $75.05 |
| LABORERS:, WRECKING: GROUP 4 YARDMAN (SALVAGE YARD ONLY) | $42.25 | $29.70 | $71.95 |
| LABORERS:, WRECKING: GROUP 3 SMALL BACKHOES, LOADERS ON TRACKS, BOBCAT TYPE LOADERS, HYDRAULIC "BROCK" TYPE HAMMER OPERATORS, CONCRETE CUTTING SAWS | $47.25 | $29.70 | $76.95 |
| LABORERS:, WRECKING: GROUP 2 BURNERS, JACKHAMMERS | $47.00 | $29.70 | $76.70 |
| LABORERS:, WRECKING: GROUP 1 ADZEMAN, WRECKING LABORER | $46.25 | $29.70 | $75.95 |
| GLAZIER | $43.13 | $21.00 | $64.13 |
| PAINTERS: SPRAY, SANDBLAST (REPAINT) | $45.72 | $36.00 | $81.72 |
| PAINTERS: SPRAY, SANDBLAST (NEW CONSTRUCTION) | $47.66 | $36.00 | $83.66 |
| PAINTERS: BRUSH, TAPER (REPAINT) | $44.32 | $36.00 | $80.32 |
| PAINTERS: BRUSH, TAPER (NEW CONSTRUCTION) | $46.26 | $36.00 | $82.26 |
| PLUMBERS AND PIPEFITTERS | $52.49 | $33.60 | $86.09 |
| ROOFERS: (ALL TEAR-OFF AND/OR REMOVAL OF ANY TYPES OF ROOFING AND ALL SPUDDING, SWEEPING, VACUUMING AND/OR CLEANUP OF ANY AND ALL AREAS OF ANY TYPE WHERE A ROOF IS TO BE RELAID) | $53.53 | $35.69 | $89.22 |
| SPRINKLER FITTER (BARNSTABLE; BRISTOL (BEYOND 35 MI RADIUS OF BOSTON CITY HALL); DUKES; MIDDLESEX (ASHBY, TOWNSEND, THE AREA OF PEPPERELL AND SHIRLEY BEYOND 35 MI RADIUS OF BOSTON CITY HALL); NANTUCKET; PLYMOUTH (BEYOND 35 MI RADIUS OF BOSTON CITY HALL)) | $49.70 | $29.75 | $79.45 |
| SPRINKLER FITTER | $49.70 | $29.75 | $79.45 |
| TRUCK DRIVERS: GROUP 7 TRAILERS FOR EARTH MOVING EQUIPMENT (DOUBLE HOOKUP) POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM | $41.82 | $37.35 | $79.17 |
| TRUCK DRIVERS: GROUP 6 SPECIALIZED EARTH MOVING EQUIPMENT OVER 35 TONS POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM | $41.53 | $37.35 | $78.88 |
| TRUCK DRIVERS: GROUP 5 SPECIALIZED EARTH MOVING EQUIPMENT UNDER 35 TONS OTHER THAN CONVENTIONAL TYPE TRUCKS; LOW BED; VACHUAL; MECHANICS, PAVING RESTORATION EQUIPMENT POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM | $41.24 | $37.35 | $78.59 |
| TRUCK DRIVERS: GROUP 4 FOUR AND FIVE AXLE EQUIPMENT WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM | $41.14 | $37.35 | $78.49 |
| TRUCK DRIVERS: GROUP 3 THREE AXLE EQUIPMENT AND TIREMAN POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM | $41.02 | $37.35 | $78.37 |
| TRUCK DRIVERS: GROUP 2 TWO AXLE EQUIPMENT; & FORKLIFT OPERATOR POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM | $40.95 | $37.35 | $78.30 |
| TRUCK DRIVERS: GROUP 1 STATION WAGONS; PANEL TRUCKS; AND PICKUP TRUCKS POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM | $40.78 | $37.35 | $78.13 |