MA20260003: rev 0 → rev 1

3 rate changes, 2 removed.

Rate changes

Rates below include fringe (the full hourly package). Enter your remaining crew hours per classification to price this change for a job.

ClassificationOld totalNew totalΔ/hrHours on jobCost impact
LINE CONSTRUCTION: HEAVY EQUIPMENT OPERATOR$62.07$64.82+2.75
LINE CONSTRUCTION: LINEMAN, CABLE SPLICER AND DYNAMITE MAN$68.96$72.01+3.05
LINE CONSTRUCTION: MATERIAL MAN, TRACTOR TRAILER DRIVER, EQUIPMENT OPERATOR$59.13$61.72+2.59

Removed classifications

Plasterer tender - BARNSTABLE, BRISTOL, DUKES, ESSEX, NANTUCKET, MIDDLESEX (with the exception of Arlington, Belmont, Burlington, Cambridge, Everett, Malden, Medford, Melrose, Reading, Somerville, Stoneham, Wakefield, Winchester, Winthrop and Woburn); NORFOLK (with the exception of Brookline Dedham and Milton) COUNTIESwas $38.95
Plasterer tender - SUFFOLK COUNTY (Boston, Chelsea, Revere, Winthrop, Deer Island, Nut Island); MIDDLESEX COUNTY (Arlington, Belmont, Burlington, Cambridge, Everett, Malden, Medford, Melrose, Reading, Somerville, Stoneham, Wakefield, Winchester, Winthrop and Woburn only); NORFOLK COUNTY (Brookline, Dedham, and Milton only)was $46.20