Building construction wages: Tangipahoa, Louisiana
Wage determination LA20260045 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/LA20260045 on · latest revision 2 · verify at sam.gov/wage-determination/LA20260045/2
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 2 | 2026-05-18 | diff vs rev 1 |
| rev 1 | 2026-05-17 | diff vs rev 0 |
| rev 0 | 2026-01-30 | original |
Current rates (rev 2)
The CSV and the printed sheet are snapshots of rev 2. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $32.66 | $9.86 | $42.52 |
| ELECTRICIAN (COMMUNICATION TECHNICIAN AND LOW VOLTAGE WIRING ONLY) | $36.00 | $16.66 | $52.66 |
| ELECTRICIAN (EXCLUDING COMMUNICATION TECHNICIAN AND LOW VOLTAGE WIRING) | $30.35 | $12.46 | $42.81 |
| ELEVATOR MECHANIC A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY AND CHRISTMAS DAY. B. VACATION: EMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE FOR 5 YEARS OR MORE OF SERVICE; 6% OF BASIC HOURLY RATE FOR UNDER 5 YEARS OF SERVICE AS VACATION PAY CREDIT | $51.11 | $38.44 | $89.55 |
| POWER EQUIPMENT OPERATOR: CRANE CRANE PREMIUMS: 50-150 TONS $1.75 OVER 150 TONS $2.25 | $23.46 | $8.35 | $31.81 |
| IRONWORKER (REINFORCING AND STRUCTURAL) | $34.75 | $13.86 | $48.61 |
| GLAZIER | $25.44 | $12.20 | $37.64 |
| PAINTER (SPRAY, EXCLUDING DRYWALL FINISHING/TAPING) | $18.83 | $9.48 | $28.31 |
| CEMENT MASON/CONCRETE FINISHER | $30.47 | $7.97 | $38.44 |
| PLUMBER (INSTALLATION OF HVAC TEMPERATURE CONTROLS; EXCLUDING HVAC PIPE AND UNIT INSTALLATION) | $33.30 | $14.98 | $48.28 |
| PIPEFITTER (INCLUDING HVAC PIPE AND UNIT INSTALLATION; EXCLUDING INSTALLATION OF HVAC TEMPERATURE CONTROLS) | $34.87 | $17.79 | $52.66 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $26.71 | $11.93 | $38.64 |
| TRUCK DRIVER: DUMP TRUCK | $15.00 | $0.00 | $15.00 |
| TILE SETTER | $20.00 | $0.00 | $20.00 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $20.98 | $5.46 | $26.44 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $20.66 | $0.00 | $20.66 |
| ROOFER | $16.77 | $5.66 | $22.43 |
| PAINTER: DRYWALL FINISHING/TAPING | $18.63 | $3.43 | $22.06 |
| PAINTER (BRUSH AND ROLLER), EXCLUDES DRYWALL FINISHING/TAPING | $18.95 | $8.91 | $27.86 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.03 | $0.00 | $21.03 |
| LABORER: MASON TENDER - BRICK | $12.39 | $0.00 | $12.39 |
| LABORER: COMMON OR GENERAL | $13.28 | $0.00 | $13.28 |
| DRYWALL HANGER AND METAL STUD INSTALLER | $18.35 | $4.33 | $22.68 |
| CARPENTER, EXCLUDES DRYWALL HANGING AND METAL STUD INSTALLATION, AND FORM WORK | $19.25 | $2.73 | $21.98 |
| CARPENTER (FORM WORK ONLY) | $15.00 | $0.00 | $15.00 |
| BRICKLAYER | $18.88 | $0.00 | $18.88 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.