Highway construction wages: East Baton Rouge + 14 more counties, Louisiana
Wage determination LA20260013 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/LA20260013 on · latest revision 1 · verify at sam.gov/wage-determination/LA20260013/1
East Baton RougeCalcasieuCameronLafayetteGrantRapidesAscensionEast FelicianaIbervilleLivingstonPointe CoupeeSt HelenaSt MartinWest Baton RougeWest Feliciana
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| MECHANIC | $25.40 | $8.05 | $33.45 |
| LABORER: COMMON OR GENERAL (CALCASIEU AND CAMERON COUNTIES) | $12.79 | $1.73 | $14.52 |
| LABORER: COMMON OR GENERAL (GRANT, LAFAYETTE, AND RAPIDES COUNTIES) | $11.00 | $3.50 | $14.50 |
| LABORER: COMMON OR GENERAL (ASCENSION, EAST BATON ROUGE, EAST FELICIANA, IBERVILLE, LIVINGSTON, POINTE COUPEE, ST. HELENA, ST. MARTIN, WEST BATON ROUGE, AND WEST FELICIANA COUNTIES) | $15.00 | $2.77 | $17.77 |
| TRUCK DRIVERS: WATER TRUCK | $13.79 | $0.00 | $13.79 |
| TRUCK DRIVERS: DUMP TRUCK | $12.69 | $0.00 | $12.69 |
| POWER EQUIPMENT OPERATORS: TRENCHER | $14.38 | $0.00 | $14.38 |
| POWER EQUIPMENT OPERATORS: ROLLER (ASPHALT AND DIRT COMPACTION) | $14.29 | $4.23 | $18.52 |
| POWER EQUIPMENT OPERATORS: MILLING MACHINE | $15.38 | $2.14 | $17.52 |
| POWER EQUIPMENT OPERATORS: GRADER/BLADE | $15.88 | $0.00 | $15.88 |
| POWER EQUIPMENT OPERATORS: CRANE | $24.30 | $0.00 | $24.30 |
| POWER EQUIPMENT OPERATORS: BULLDOZER | $16.40 | $0.00 | $16.40 |
| POWER EQUIPMENT OPERATORS: BROOM/SWEEPER | $14.05 | $0.00 | $14.05 |
| POWER EQUIPMENT OPERATORS: BACKHOE/EXCAVATOR/TRACKHOE | $16.13 | $0.00 | $16.13 |
| POWER EQUIPMENT OPERATORS: ASPHALT PAVER | $17.20 | $4.97 | $22.17 |
| IRONWORKER, REINFORCING | $17.49 | $0.00 | $17.49 |
| CEMENT MASON/CONCRETE FINISHER | $20.03 | $4.24 | $24.27 |
| CARPENTER, INCLUDES FORM WORK | $18.22 | $4.48 | $22.70 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.