Highway construction wages: Lafourche, Terrebonne, Louisiana
Wage determination LA20260012 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/LA20260012 on · latest revision 1 · verify at sam.gov/wage-determination/LA20260012/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| MECHANIC | $25.40 | $8.05 | $33.45 |
| TRUCK DRIVERS: WATER TRUCK | $13.79 | $0.00 | $13.79 |
| TRUCK DRIVERS: DUMP TRUCK | $12.93 | $0.18 | $13.11 |
| POWER EQUIPMENT OPERATORS: TRENCHER | $14.38 | $0.00 | $14.38 |
| POWER EQUIPMENT OPERATORS: ROLLER (ASPHALT AND DIRT COMPACTION) | $14.74 | $4.23 | $18.97 |
| POWER EQUIPMENT OPERATORS: MILLING MACHINE | $16.63 | $2.14 | $18.77 |
| POWER EQUIPMENT OPERATORS: GRADER/BLADE | $15.88 | $0.00 | $15.88 |
| POWER EQUIPMENT OPERATORS: CRANE | $25.97 | $0.00 | $25.97 |
| POWER EQUIPMENT OPERATORS: BULLDOZER | $16.40 | $0.00 | $16.40 |
| POWER EQUIPMENT OPERATORS: BROOM/SWEEPER | $15.17 | $5.15 | $20.32 |
| POWER EQUIPMENT OPERATORS: BACKHOE/EXCAVATOR/TRACKHOE | $20.03 | $0.00 | $20.03 |
| POWER EQUIPMENT OPERATORS: ASPHALT PAVER | $17.20 | $4.97 | $22.17 |
| PILEDRIVERMAN | $19.00 | $0.00 | $19.00 |
| LABORER: COMMON OR GENERAL | $13.83 | $2.94 | $16.77 |
| IRONWORKER, REINFORCING | $17.49 | $0.00 | $17.49 |
| CEMENT MASON/CONCRETE FINISHER | $18.00 | $2.94 | $20.94 |
| CARPENTER, INCLUDES FORM WORK | $19.13 | $0.00 | $19.13 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.