Heavy construction wages: Cameron + 39 more counties, Louisiana
Wage determination LA20260004 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/LA20260004 on · latest revision 2 · verify at sam.gov/wage-determination/LA20260004/2
CameronJefferson DavisVermilionAllenAvoyellesBeauregardCaldwellCatahoulaConcordiaEvangelineFranklinGrantLa SalleNatchitochesSabineTensasVernonWinnAssumptionEast FelicianaIberiaIbervillePointe CoupeeSt HelenaSt MaryTangipahoaWest FelicianaWashingtonBienvilleClaiborneDe SotoEast CarrollJacksonLincolnMadisonMorehouseRed RiverRichlandUnionWest Carroll
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 2 | 2026-05-18 | diff vs rev 1 |
| rev 1 | 2026-05-17 | diff vs rev 0 |
| rev 0 | 2026-01-30 | original |
Current rates (rev 2)
The CSV and the printed sheet are snapshots of rev 2. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (ASSUMPTION AND ST. MARY (NORTHEAST OF ATCHAFALAYA RIVER) PARISHES) | $36.00 | $16.66 | $52.66 |
| ELECTRICIAN (BIENVILLE, CLAIBORNE, DE SOTO, NATCHITOCHES (NORTHEAST OF THE RED RIVER), AND RED RIVER PARISHES) | $35.85 | $15.58 | $51.43 |
| ELECTRICIAN (CALDWELL, EAST CARROLL, FRANKLIN, JACKSON, LINCOLN, MADISON, MOREHOUSE, RICHLAND, TENSAS, UNION, AND WEST CARROLL PARISHES) | $29.55 | $14.36 | $43.91 |
| ELECTRICIAN (AVOYELLES, CATAHOULA, CONCORDIA, EVANGELINE, GRANT, LA SALLE, NATCHITOCHES (SOUTHWEST OF RED RIVER), SABINE, VERNON, AND WINN PARISHES) | $30.00 | $12.03 | $42.03 |
| ELECTRICIAN (ALLEN, BEAUREGARD, CAMERON, IBERIA, JEFFERSON DAVIS, ST. MARY (SOUTHWEST OF ATCHAFALAYA RIVER), AND VERMILION PARISHES) | $31.98 | $15.14 | $47.12 |
| ELECTRICIAN (EAST FELICIANA, IBERVILLE, POINTE COUPEE, ST. HELENA, AND WEST FELICIANA PARISHES) | $29.47 | $13.50 | $42.97 |
| ELECTRICIAN (TANGIPAHOA AND WASHINGTON PARISHES) | $30.35 | $12.46 | $42.81 |
| TRUCK DRIVERS: WATER | $8.00 | $0.00 | $8.00 |
| TRUCK DRIVERS: DUMP | $10.00 | $0.00 | $10.00 |
| POWER EQUIPMENT OPERATORS: WATER WELL DRILLER | $10.73 | $2.01 | $12.74 |
| POWER EQUIPMENT OPERATORS: TRACTOR | $10.43 | $0.00 | $10.43 |
| POWER EQUIPMENT OPERATORS: TRACKHOE | $11.99 | $0.00 | $11.99 |
| POWER EQUIPMENT OPERATORS: MECHANIC | $12.50 | $0.00 | $12.50 |
| POWER EQUIPMENT OPERATORS: FRONT END LOADER | $9.93 | $0.00 | $9.93 |
| POWER EQUIPMENT OPERATORS: DRAGLINE | $13.12 | $0.00 | $13.12 |
| POWER EQUIPMENT OPERATORS: CRANE | $13.60 | $0.00 | $13.60 |
| POWER EQUIPMENT OPERATORS: BULLDOZER | $11.82 | $0.00 | $11.82 |
| POWER EQUIPMENT OPERATORS: BORING MACHINE | $10.25 | $0.00 | $10.25 |
| POWER EQUIPMENT OPERATORS: BACKHOE/EXCAVATOR | $11.67 | $0.00 | $11.67 |
| PIPEFITTER (EXCLUDING PIPELAYING) | $18.75 | $4.05 | $22.80 |
| LABORERS: (PIPELAYER) | $8.47 | $0.00 | $8.47 |
| LABORERS: (COMMON) | $7.60 | $0.00 | $7.60 |
| CARPENTER (INCLUDING FORMSETTING/FORMBUILDING) | $14.75 | $0.00 | $14.75 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.