KY20260082: rev 0 → rev 1
3 rate changes, 3 added, 1 removed.
Rate changes
Rates below include fringe (the full hourly package). Enter your remaining crew hours per classification to price this change for a job.
| Classification | Old total | New total | Δ/hr | Hours on job | Cost impact |
|---|---|---|---|---|---|
| LINE CONSTRUCTION: EQUIPMENT OPERATOR | $46.55 | $56.73 | +10.18 | — | |
| LINE CONSTRUCTION: GROUNDMAN | $33.17 | $39.87 | +6.70 | — | |
| LINE CONSTRUCTION: LINEMAN | $51.24 | $62.64 | +11.40 | — |
Added classifications
| POWER EQUIPMENT OPERATOR GROUP 1 DRILL; PUMPCRETE; ROLLER (BITUMINOUS) OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 |
| POWER EQUIPMENT OPERATOR GROUP 1 Crane Forklift | $41.55 | $19.60 |
| POWER EQUIPMENT OPERATOR GROUP 1 CRANE; FORKLIFT OPERATORS ON CRANES WITH BOOM 150 FEET AND OVER, INCLUDING JIB, SHALL RECEIVE $0.75 ABOVE GROUP 1. ALL CRANES WITH PILING LEADS WILL RECEIVE $0.50 ABOVE GROUP 1 RATE REGARDLESS OF BOOM LENGTH. COMBINATION RATE SHALL MEAN $0.50 PER HOUR ABOVE THE BASIC HOURLY RATE OF PAY. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 |
Removed classifications
| POWER EQUIPMENT OPERATOR - GROUP 1 | was $41.55 |