Highway construction wages: Osage, Kansas
Wage determination KS20260144 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/KS20260144 on July 24, 2026 · latest revision 1 · verify at sam.gov/wage-determination/KS20260144/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER, STRUCTURAL | $39.00 | $34.25 | $73.25 |
| TRUCK DRIVER: OFF ROAD TRUCK | $19.06 | $0.00 | $19.06 |
| TRUCK DRIVER: FLATBED AND LOWBOY | $23.82 | $9.89 | $33.71 |
| TRUCK DRIVER: DUMP AND TANDEM | $23.23 | $11.51 | $34.74 |
| TRUCK DRIVER: WATER TRUCK | $22.45 | $11.51 | $33.96 |
| TRAFFIC SIGNALIZATION: TRAFFIC SIGNAL INSTALLATION (GROUNDMAN) | $16.54 | $0.00 | $16.54 |
| TRAFFIC CONTROL: SERVICE DRIVER | $15.76 | $0.00 | $15.76 |
| OPERATOR: STRIPING MACHINE | $27.27 | $12.25 | $39.52 |
| OPERATOR: ROTO MILL GROUNDMAN | $18.43 | $0.00 | $18.43 |
| OPERATOR: ROTO MILL | $21.05 | $0.00 | $21.05 |
| OPERATOR: TRACTOR | $16.96 | $0.00 | $16.96 |
| OPERATOR: SCREED | $16.93 | $0.00 | $16.93 |
| OPERATOR: SCRAPER | $17.67 | $0.00 | $17.67 |
| OPERATOR: ROLLER | $16.09 | $0.00 | $16.09 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $27.84 | $15.53 | $43.37 |
| OPERATOR: MECHANIC | $25.45 | $9.49 | $34.94 |
| OPERATOR: MATERIAL TRANSFER VEHICLE | $14.65 | $0.00 | $14.65 |
| OPERATOR: LOADER | $18.87 | $4.26 | $23.13 |
| OPERATOR: GRADER/BLADE | $25.14 | $9.03 | $34.17 |
| OPERATOR: CRANE | $21.18 | $6.96 | $28.14 |
| OPERATOR: CONCRETE FINISHING MACHINE | $24.26 | $0.00 | $24.26 |
| OPERATOR: BULLDOZER | $19.35 | $5.41 | $24.76 |
| OPERATOR: BROOM/SWEEPER | $19.17 | $0.00 | $19.17 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $20.14 | $5.73 | $25.87 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $22.43 | $3.20 | $25.63 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $29.75 | $12.83 | $42.58 |
| LABORER: FLAGGER | $13.20 | $0.00 | $13.20 |
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) | $29.21 | $14.63 | $43.84 |
| LABORER: COMMON OR GENERAL | $17.44 | $0.00 | $17.44 |
| IRONWORKER, REINFORCING | $30.50 | $27.05 | $57.55 |
| ELECTRICIAN | $29.93 | $14.14 | $44.07 |
| CEMENT MASON/CONCRETE FINISHER | $27.45 | $10.10 | $37.55 |
| CARPENTER, INCLUDES FORM WORK | $17.12 | $4.74 | $21.86 |
| LABORER: PIPELAYER | $32.12 | $14.73 | $46.85 |