Highway construction wages: Linn, Kansas
Wage determination KS20260142 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/KS20260142 on · latest revision 1 · verify at sam.gov/wage-determination/KS20260142/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (EXCLUDES FORM WORK) | $43.28 | $21.25 | $64.53 |
| POWER EQUIPMENT OPERATOR: ROTO MILL | $40.17 | $22.29 | $62.46 |
| POWER EQUIPMENT OPERATOR: BROOM/SWEEPER | $40.17 | $22.29 | $62.46 |
| IRONWORKER (REINFORCING AND STRUCTURAL) | $39.00 | $34.25 | $73.25 |
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) | $37.45 | $15.87 | $53.32 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER, AND DISTRIBUTOR | $37.45 | $15.87 | $53.32 |
| TRUCK DRIVER: OFF ROAD TRUCK | $19.06 | $0.00 | $19.06 |
| TRUCK DRIVER: FLATBED AND LOWBOY | $27.96 | $14.05 | $42.01 |
| TRUCK DRIVER: DUMP AND TANDEM | $29.04 | $12.45 | $41.49 |
| TRAFFIC SIGNALIZATION: TRAFFIC SIGNAL INSTALLATION (GROUNDMAN) | $17.10 | $0.00 | $17.10 |
| TRAFFIC CONTROL: SERVICE DRIVER | $18.72 | $7.52 | $26.24 |
| OPERATOR: STRIPING MACHINE | $27.27 | $12.25 | $39.52 |
| OPERATOR: ROTO MILL GROUNDMAN | $18.43 | $0.00 | $18.43 |
| OPERATOR: TRACTOR | $24.28 | $0.00 | $24.28 |
| OPERATOR: SCREED | $17.38 | $3.52 | $20.90 |
| OPERATOR: SCRAPER | $17.67 | $0.00 | $17.67 |
| OPERATOR: ROLLER | $29.00 | $11.40 | $40.40 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $32.88 | $15.53 | $48.41 |
| OPERATOR: MECHANIC | $32.25 | $15.31 | $47.56 |
| OPERATOR: MATERIAL TRANSFER VEHICLE | $14.65 | $0.00 | $14.65 |
| OPERATOR: LOADER | $32.46 | $14.14 | $46.60 |
| OPERATOR: GRADER/BLADE | $29.66 | $12.55 | $42.21 |
| OPERATOR: CRANE | $30.38 | $11.08 | $41.46 |
| OPERATOR: CONCRETE SAW | $33.87 | $15.16 | $49.03 |
| OPERATOR: CONCRETE FINISHING MACHINE | $24.26 | $0.00 | $24.26 |
| OPERATOR: BULLDOZER | $28.15 | $11.65 | $39.80 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $33.35 | $14.10 | $47.45 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $35.23 | $15.53 | $50.76 |
| LINE CONSTRUCTION: LINEMAN | $41.52 | $17.56 | $59.08 |
| LINE CONSTRUCTION: GROUNDMAN | $26.76 | $12.71 | $39.47 |
| LINE CONSTRUCTION: EQUIPMENT OPERATOR | $32.15 | $15.06 | $47.21 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $29.75 | $12.83 | $42.58 |
| LABORER: FLAGGER | $13.20 | $0.00 | $13.20 |
| LABORER: COMMON OR GENERAL | $18.68 | $1.63 | $20.31 |
| ELECTRICIAN | $29.93 | $14.14 | $44.07 |
| CEMENT MASON/CONCRETE FINISHER | $28.92 | $15.80 | $44.72 |
| CARPENTER (FORM WORK ONLY) | $29.45 | $14.08 | $43.53 |
| TRUCK DRIVER: WATER TRUCK | $38.04 | $15.85 | $53.89 |
| LABORER: PIPELAYER | $32.12 | $14.73 | $46.85 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.