Building construction wages: Pottawatomie, Kansas
Wage determination KS20260055 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/KS20260055 on · latest revision 1 · verify at sam.gov/wage-determination/KS20260055/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION)) | $45.60 | $35.47 | $81.07 |
| TILE SETTER | $42.73 | $18.39 | $61.12 |
| BRICKLAYER | $28.34 | $10.33 | $38.67 |
| TILE FINISHER | $20.74 | $1.46 | $22.20 |
| CARPENTER (DRYWALL HANGING ONLY) | $28.34 | $14.08 | $42.42 |
| ELECTRICIAN | $44.05 | $20.25 | $64.30 |
| ELEVATOR MECHANIC A. VACATION PAY: 6% FOR 6 MONTHS TO 5 YEARS SERVICE; 8% WITH 5 OR MORE YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND FRIDAY AFTER, AND CHRISTMAS DAY | $60.69 | $38.44 | $99.13 |
| POWER EQUIPMENT OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $45.48 | $22.42 | $67.90 |
| POWER EQUIPMENT OPERATOR: OILER | $39.93 | $22.42 | $62.35 |
| IRONWORKER: ORNAMENTAL | $36.00 | $34.25 | $70.25 |
| LABORER: MASON TENDER - BRICK | $17.20 | $10.27 | $27.47 |
| PAINTER (SPRAY) | $36.18 | $19.97 | $56.15 |
| PLUMBER | $45.90 | $19.94 | $65.84 |
| PIPEFITTER | $45.90 | $19.94 | $65.84 |
| SPRINKLER FITTER: FIRE SPRINKLER | $41.83 | $27.60 | $69.43 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $52.18 | $27.15 | $79.33 |
| TRUCK DRIVER: DUMP (ALL TYPES) | $17.05 | $0.00 | $17.05 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $29.93 | $13.32 | $43.25 |
| ROOFER | $22.87 | $6.84 | $29.71 |
| PAINTER (BRUSH AND ROLLER) | $22.07 | $0.97 | $23.04 |
| OPERATOR: ROLLER | $33.78 | $13.64 | $47.42 |
| OPERATOR: LOADER | $26.30 | $11.62 | $37.92 |
| OPERATOR: GRADER/BLADE | $28.79 | $12.73 | $41.52 |
| OPERATOR: FORKLIFT | $37.92 | $0.00 | $37.92 |
| OPERATOR: CRANE | $33.19 | $14.16 | $47.35 |
| OPERATOR: BULLDOZER | $33.12 | $13.96 | $47.08 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $27.78 | $12.58 | $40.36 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $31.56 | $11.28 | $42.84 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $17.86 | $1.01 | $18.87 |
| LABORER: COMMON OR GENERAL | $13.19 | $1.85 | $15.04 |
| IRONWORKER, STRUCTURAL | $29.00 | $25.35 | $54.35 |
| IRONWORKER, REINFORCING | $27.22 | $21.91 | $49.13 |
| CEMENT MASON/CONCRETE FINISHER | $19.88 | $0.00 | $19.88 |
| CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK | $16.31 | $0.00 | $16.31 |
| CARPENTER (FORM WORK ONLY) | $15.08 | $0.00 | $15.08 |
| TRUCK DRIVER: LOWBOY TRUCK | $39.89 | $15.85 | $55.74 |
| TRUCK DRIVER: SEMI-TRAILER TRUCK | $39.89 | $15.85 | $55.74 |
| SHEET METAL WORKER (HVAC UNIT INSTALLATION ONLY) | $41.57 | $20.60 | $62.17 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.