Building construction wages: Linn, Kansas
Wage determination KS20260054 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/KS20260054 on · latest revision 1 · verify at sam.gov/wage-determination/KS20260054/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION)) | $45.60 | $35.47 | $81.07 |
| BRICKLAYER | $43.57 | $23.02 | $66.59 |
| TILE FINISHER | $20.74 | $1.46 | $22.20 |
| TILE SETTER | $30.18 | $13.52 | $43.70 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $43.28 | $21.25 | $64.53 |
| CARPENTER (EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING AND FLOOR LAYING CARPET) | $44.63 | $22.40 | $67.03 |
| CARPENTER (FLOOR LAYING-CARPET ONLY) | $40.94 | $21.25 | $62.19 |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | $37.61 | $22.60 | $60.21 |
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING) | $51.01 | $26.25 | $77.26 |
| ELEVATOR MECHANIC A. VACATION PAY: 6% FOR 6 MONTHS TO 5 YEARS SERVICE; 8% WITH 5 OR MORE YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND FRIDAY AFTER, AND CHRISTMAS DAY | $60.69 | $38.44 | $99.13 |
| POWER EQUIPMENT OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $45.48 | $22.42 | $67.90 |
| POWER EQUIPMENT OPERATOR: OILER | $39.93 | $22.42 | $62.35 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $44.14 | $22.42 | $66.56 |
| POWER EQUIPMENT OPERATOR: CRANE | $47.29 | $22.42 | $69.71 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $45.48 | $22.42 | $67.90 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $45.48 | $22.42 | $67.90 |
| IRONWORKER: ORNAMENTAL, REINFORCING AND STRUCTURAL | $39.00 | $34.25 | $73.25 |
| LABORERS: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $31.99 | $16.03 | $48.02 |
| LABORER: COMMON OR GENERAL | $31.60 | $16.95 | $48.55 |
| LABORER: MASON TENDER - BRICK | $26.84 | $11.38 | $38.22 |
| GLAZIER | $39.32 | $22.34 | $61.66 |
| PAINTER: BRUSH, ROLLER, AND SPRAY | $36.18 | $19.97 | $56.15 |
| PAINTER: DRYWALL FINISHING/TAPING | $36.18 | $19.97 | $56.15 |
| CEMENT MASON/CONCRETE FINISHER | $40.13 | $20.50 | $60.63 |
| PLUMBER | $54.28 | $23.79 | $78.07 |
| PIPEFITTER (INCLUDING HVAC PIPE, UNIT, AND INSTALLATION OF HVAC ELECTRICIAL/TEMPERATURE CONTROLS) | $55.56 | $25.80 | $81.36 |
| ROOFER | $38.45 | $22.29 | $60.74 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $52.18 | $27.15 | $79.33 |
| SHEET METAL WORKER (EXCLUDES HVAC DUCT INSTALLATION) | $52.18 | $27.15 | $79.33 |
| TRUCK DRIVER: DUMP (ALL TYPES) | $27.29 | $10.71 | $38.00 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $26.68 | $11.61 | $38.29 |
| PLASTERER | $29.85 | $13.29 | $43.14 |
| OPERATOR: ROLLER | $32.68 | $13.57 | $46.25 |
| OPERATOR: LOADER | $30.35 | $12.04 | $42.39 |
| OPERATOR: BULLDOZER | $33.12 | $13.96 | $47.08 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $17.86 | $1.01 | $18.87 |
| LABORER: LANDSCAPE | $12.48 | $0.00 | $12.48 |
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) | $31.51 | $11.60 | $43.11 |
| CARPENTER (DRYWALL HANGING ONLY) | $30.00 | $1.62 | $31.62 |
| TRUCK DRIVER: LOWBOY TRUCK | $39.89 | $15.85 | $55.74 |
| TRUCK DRIVER: SEMI-TRAILER TRUCK | $39.89 | $15.85 | $55.74 |
| OPERATOR: GRADER/BLADE | $41.36 | $21.74 | $63.10 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.