Building construction wages: Seward, Kansas
Wage determination KS20260043 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/KS20260043 on · latest revision 1 · verify at sam.gov/wage-determination/KS20260043/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $45.60 | $35.47 | $81.07 |
| BRICKLAYER | $29.07 | $15.61 | $44.68 |
| ELEVATOR MECHANIC A. VACATION PAY: 6% FOR 6 MONTHS TO 5 YEARS SERVICE; 8% WITH 5 OR MORE YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND FRIDAY AFTER, AND CHRISTMAS DAY | $60.69 | $38.44 | $99.13 |
| IRONWORKER, REINFORCING | $39.00 | $34.25 | $73.25 |
| PAINTER: BRUSH AND ROLLER | $36.18 | $19.97 | $56.15 |
| PIPEFITTER (EXCLUDES HVAC PIPE AND UNIT INSTALLATION) | $45.90 | $19.94 | $65.84 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $45.90 | $19.94 | $65.84 |
| SPRINKLER FITTER: FIRE SPRINKLER | $41.83 | $27.60 | $69.43 |
| SHEET METAL WORKER (EXCLUDES HVAC DUCT AND UNIT INSTALLATION) | $52.18 | $27.15 | $79.33 |
| SHEET METAL WORKER (HVAC UNIT INSTALLATION ONLY) | $28.20 | $10.85 | $39.05 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $23.18 | $5.83 | $29.01 |
| ROOFER | $14.48 | $2.96 | $17.44 |
| PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION | $27.79 | $10.85 | $38.64 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $15.72 | $1.95 | $17.67 |
| METAL BUILDING ERECTOR | $11.19 | $1.83 | $13.02 |
| LABORER: COMMON OR GENERAL | $11.40 | $0.00 | $11.40 |
| IRONWORKER, STRUCTURAL | $23.02 | $15.09 | $38.11 |
| GLAZIER | $18.92 | $6.64 | $25.56 |
| FORM WORKER | $13.33 | $0.00 | $13.33 |
| ELECTRICIAN, EXCLUDES INSTALLATION OF HVAC/TEMPERATURE CONTROLS | $27.63 | $10.96 | $38.59 |
| CEMENT MASON/CONCRETE FINISHER | $18.01 | $3.33 | $21.34 |
| CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK | $19.04 | $3.95 | $22.99 |
| CARPENTER (DRYWALL HANGING ONLY) | $17.92 | $2.09 | $20.01 |
| ELECTRICIAN (HVAC/TEMPERATURE CONTROLS INSTALLATION ONLY) | $38.75 | $18.52 | $57.27 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.