Heavy construction wages: Cherokee, Kansas
Wage determination KS20260036 · Active · Standard
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1) · download CSV · print this page for your bid file
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $44.05 | $20.25 | $64.30 |
| IRONWORKER (REINFORCING AND STRUCTURAL) | $29.99 | $13.91 | $43.90 |
| TRUCK DRIVER: DUMP (TANDEM) TRUCK | $15.70 | $3.58 | $19.28 |
| PAINTER: BRUSH, ROLLER, AND SPRAY | $18.03 | $0.78 | $18.81 |
| OPERATOR: TRACTOR | $15.90 | $0.00 | $15.90 |
| OPERATOR: SCRAPER | $15.68 | $0.00 | $15.68 |
| OPERATOR: LOADER | $16.17 | $0.00 | $16.17 |
| OPERATOR: CRANE | $28.00 | $0.00 | $28.00 |
| OPERATOR: BULLDOZER | $16.75 | $0.00 | $16.75 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $18.84 | $3.97 | $22.81 |
| LABORER: PIPELAYER | $14.13 | $1.30 | $15.43 |
| LABORER: COMMON OR GENERAL | $13.50 | $0.00 | $13.50 |
| CEMENT MASON/CONCRETE FINISHER | $13.67 | $0.00 | $13.67 |
| CARPENTER | $17.67 | $1.62 | $19.29 |