Building construction wages: Ellis, Kansas
Wage determination KS20260007 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/KS20260007 on July 24, 2026 · latest revision 1 · verify at sam.gov/wage-determination/KS20260007/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $45.60 | $35.47 | $81.07 |
| BRICKLAYER | $29.07 | $15.61 | $44.68 |
| ELEVATOR MECHANIC A. VACATION PAY: 6% FOR 6 MONTHS TO 5 YEARS SERVICE; 8% WITH 5 OR MORE YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND FRIDAY AFTER, AND CHRISTMAS DAY | $60.69 | $38.44 | $99.13 |
| IRONWORKER, REINFORCING | $39.00 | $34.25 | $73.25 |
| PAINTER: BRUSH AND ROLLER | $36.18 | $19.97 | $56.15 |
| PIPEFITTER (EXCLUDES HVAC PIPE AND UNIT INSTALLATION) | $45.90 | $19.94 | $65.84 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $45.90 | $19.94 | $65.84 |
| SPRINKLER FITTER: FIRE SPRINKLER | $41.83 | $27.60 | $69.43 |
| SHEET METAL WORKER (EXCLUDES HVAC DUCT AND UNIT INSTALLATION) | $52.18 | $27.15 | $79.33 |
| SHEET METAL WORKER (HVAC UNIT INSTALLATION ONLY) | $28.20 | $10.85 | $39.05 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $23.18 | $5.83 | $29.01 |
| ROOFER | $14.48 | $2.96 | $17.44 |
| PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION | $27.79 | $10.85 | $38.64 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $15.72 | $1.95 | $17.67 |
| METAL BUILDING ERECTOR | $11.19 | $1.83 | $13.02 |
| LABORER: COMMON OR GENERAL | $12.37 | $2.77 | $15.14 |
| IRONWORKER, STRUCTURAL | $23.02 | $15.09 | $38.11 |
| GLAZIER | $18.92 | $6.64 | $25.56 |
| FORM WORKER | $13.33 | $0.00 | $13.33 |
| ELECTRICIAN, EXCLUDES INSTALLATION OF HVAC/TEMPERATURE CONTROLS | $27.63 | $10.96 | $38.59 |
| CEMENT MASON/CONCRETE FINISHER | $18.01 | $3.33 | $21.34 |
| CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK | $15.94 | $2.06 | $18.00 |
| CARPENTER (DRYWALL HANGING ONLY) | $17.92 | $2.09 | $20.01 |
| ELECTRICIAN (HVAC/TEMPERATURE CONTROLS INSTALLATION ONLY) | $38.75 | $18.52 | $57.27 |