Residential construction wages: Jackson, Indiana
Wage determination IN20260032 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/IN20260032 on · latest revision 2 · verify at sam.gov/wage-determination/IN20260032/2
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 2 | 2026-05-18 | diff vs rev 1 |
| rev 1 | 2026-05-17 | diff vs rev 0 |
| rev 0 | 2026-01-30 | original |
Current rates (rev 2)
The CSV and the printed sheet are snapshots of rev 2. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR | $33.65 | $16.40 | $50.05 |
| POWER EQUIPMENT OPERATOR: PAVER: ASPHALT, AGGREGATE, AND CONCRETE | $33.65 | $16.40 | $50.05 |
| POWER EQUIPMENT OPERATOR: (2) LOADER | $38.60 | $28.83 | $67.43 |
| LABORER: (2) MASON TENDER - CEMENT/CONCRETE | $37.15 | $23.48 | $60.63 |
| LABORER: (1) PIPELAYER | $23.13 | $16.00 | $39.13 |
| PLUMBER | $34.01 | $14.00 | $48.01 |
| ROOFER | $43.00 | $21.41 | $64.41 |
| SHEET METAL WORKER (EXCLUDES HVAC DUCT INSTALLATION) | $43.44 | $27.89 | $71.33 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $26.20 | $10.74 | $36.94 |
| PAINTER: SPRAY | $18.29 | $7.43 | $25.72 |
| PAINTER: ROLLER | $18.29 | $7.43 | $25.72 |
| PAINTER: BRUSH ONLY | $18.29 | $7.43 | $25.72 |
| OPERATOR: BULLDOZER | $27.35 | $13.44 | $40.79 |
| LABORER: MASON TENDER - BRICK | $14.00 | $0.00 | $14.00 |
| LABORER: COMMON OR GENERAL | $13.93 | $0.00 | $13.93 |
| ELECTRICIAN | $17.48 | $3.40 | $20.88 |
| CEMENT MASON/CONCRETE FINISHER | $17.78 | $0.00 | $17.78 |
| CARPENTER | $18.36 | $7.46 | $25.82 |