Building construction wages: Jefferson, Scott, Indiana
Wage determination IN20260010 · Active · Standard
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1) · download CSV · print this page for your bid file
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER (REMAINGING WORK) | $10.00 | $0.00 | $10.00 |
| SHEET METAL WORKER (HVAC DUCT WORK) | $12.87 | $0.00 | $12.87 |
| POWER EQUIPMENT OPERATORS: LOADER | $14.67 | $0.00 | $14.67 |
| POWER EQUIPMENT OPERATORS: BULLDOZER | $9.00 | $0.00 | $9.00 |
| POWER EQUIPMENT OPERATORS: (BACKHOE) | $11.06 | $0.00 | $11.06 |
| PLUMBER (REMAINING WORK) | $10.75 | $0.66 | $11.41 |
| PLUMBER (HVAC WORK) | $14.14 | $2.71 | $16.85 |
| PAINTER (EXCLUDING DRYWALL FINISHING) | $7.25 | $0.00 | $7.25 |
| LABORER (UNSKILLED) | $9.43 | $2.19 | $11.62 |
| IRONWORKER (STRUCTURAL) | $10.00 | $0.00 | $10.00 |
| HOD CARRIER (REMAINING COUNTY) | $12.90 | $4.30 | $17.20 |
| HOD CARRIER (ORANGE COUNTY) | $14.38 | $4.30 | $18.68 |
| ELECTRICIAN (INCLUDING HVAC CONTROL WIRING) | $10.00 | $0.58 | $10.58 |
| DRYWALL FINISHER/TAPER | $16.20 | $2.93 | $19.13 |
| CARPENTER | $10.24 | $0.00 | $10.24 |
| BRICKLAYER | $9.73 | $1.20 | $10.93 |