Current rates (rev 2) · download CSV · print this page for your bid file
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| LABORERS: GROUP 1 BUILDING AND CONSTRUCTION LABORERS; SCAFFOLD BUILDERS (OTHER THAN FOR MASON OR PLASTERERS); MECHANIC TENDERS; RODMEN AND CHAINMEN, RAILROAD WORKERS, MASONRY WALL WORKERS, (INTERIOR & EXTERIOR); ROOFER TENDERS, CEMENT FINISHER TENDERS, CARPENTER TENDERS, PORTABLE WATER, PUMPS WITH DISCHARGE UP TO 3 INCHES; WATERPROOFING; HAULING OF CREOSOTE LUMBER OR LUTEMEN; ASPHALT RAKERS; KETTLEM, EARTH COMPACTORS; JACKMAN AND SHEETMEN IN DITCHES MORE THAN 6 FT. DEEP; LABORERS IN DITCHES 6' DEEP OR DEEPER; ASSEMBLY OF UNCRETE PUMP; TILE LAYERS (SEWER OR FIELD); SEWER PIPE LAYERS; MOTOR DRIVEN WHEELBARROWS AND CONCRETE BUGGIES; HYSTER OPERATOR; PUMP CRETE ASSEMBLERS; CORE DRILL OPERATOR; CEMENT, LINE OR SILICA CLAY HANDERS; HANDLING OF TOXIC MATERIALS DAMAGING TO CLOTHING; PNEUMATIC SPIKERS; DECK ENGINE AND WINCH OPERATOR; WATER MAIN AND CABLE DUCKING; SCREED MAN OR SCREW OPERATOR ON ASPHALT PAVER; CHAIN SAW AND DEMOLITION SAW OPERATOR; CONCRETE CONVEYOR ASSEMBLER. (JASPER AND NEWTON COUNTIES) | $39.89 | $30.30 | $70.19 |
| HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING REMOVAL SCRAPPING, VACUUMING, BAGGING AND DISPOSAL OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHAINCAL SYSTEMS (NEWTON COUNTY) | $44.82 | $34.00 | $78.82 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR (NEWTON COUNTY) | $56.02 | $37.24 | $93.26 |
| HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTINGS, STRIPPING, REMOVAL, SCRAPPING, VACCUMING, BAGGING & DISPOSING OF ALL INSULATION MATERAILS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS (LAGRANGE COUNTY) | $37.25 | $19.85 | $57.10 |
| INSULATOR/ASBESTOS WORKER: INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS | $37.25 | $19.85 | $57.10 |
| HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTINGS, STRIPPING, REMOVAL, SCRAPPING, VACCUMING, BAGGING & DISPOSING OF ALL INSULATION MATERAILS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS (LAGRANGE COUNTY) | $37.25 | $19.85 | $57.10 |
| INSULATOR/ASBESTOS WORKER: INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS | $37.25 | $19.85 | $57.10 |
| HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACCUMING, BAGGING, AND DISPOSAL OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS (REMAINING COUNTIES) | $41.20 | $30.93 | $72.13 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR (REMAINING COUNTIES) | $41.20 | $30.93 | $72.13 |
| BOILERMAKER | $43.24 | $38.17 | $81.41 |
| TILE, MARBLE & TERRAZZO WORKER (JASPER, NEWTON & STARKE COUNTIES) | $42.05 | $28.22 | $70.27 |
| BRICKLAYER: INCLUDING STONEMASON, AND POINTER, CAULKER & CLEANER (JASPER, NEWTON & STARKE COUNTIES) | $42.05 | $28.22 | $70.27 |
| TILE, MARBLE SETTER (MARSHALL AND PULASKI COUNTIES) | $34.50 | $23.62 | $58.12 |
| TILE & MARBLE FINISHER (MARSHALL AND PULASKI COUNTIES) | $32.50 | $21.11 | $53.61 |
| TERRAZZO WORKER/SETTER (MARSHALL AND PULASKI COUNTIES) | $34.50 | $23.62 | $58.12 |
| TERRAZZO WORKER FINISHER (MARSHALL AND PULASKI COUNTIES) | $32.50 | $21.11 | $53.61 |
| BRICKLAYER, CAULKER, CLEANER, POINTER (MARSHALL AND PULASKI COUNTIES) | $34.00 | $19.71 | $53.71 |
| BRICKLAYER (TILE AND MARBLE WORKERS) | $33.00 | $22.33 | $55.33 |
| BRICKLAYER (TILE AND MARBLE FINISHERS) | $31.00 | $19.16 | $50.16 |
| BRICKLAYER (BRICKLAYERS, POINTER, CLEANER & CAULKERS) | $31.11 | $18.40 | $49.51 |
| CARPENTER & PILEDRIVERMEN (LAGRANGE COUNTY) | $33.42 | $25.93 | $59.35 |
| CARPENTER & PILEDRIVERMEN (ELKHART, KOSCIUSKO AND MARSHALL COUNTIES) | $35.51 | $25.51 | $61.02 |
| CARPENTER (JASPER, NEWTON, PULASKI & STARKE COUNTIES) | $43.58 | $34.66 | $78.24 |
| MILLWRIGHT (JASPER, NEWTON, PULASKI & STARKE COUNTIES) | $47.92 | $36.93 | $84.85 |
| CARPENTER (JASPER, NEWTON, PULASKI & STARKE COUNTIES) | $43.58 | $34.66 | $78.24 |
| MILLWRIGHT (JASPER, NEWTON, PULASKI & STARKE COUNTIES) | $47.92 | $36.93 | $84.85 |
| MILLWRIGHT (ADAMS, ALLEN, CASS, DEKALB, ELKHART, FULTON, GRANT, HOWARD, HUNTINGTON, KOSCIUSKO, LAGRANGE, MARSHALL, MIAMI, NOBLE, ST. JOSEPH, STEUBEN, TIPTON, WABASH, WELLS AND WHITLEY COUNTIES) | $35.89 | $30.52 | $66.41 |
| COMMUNICATION TECHNICIAN (ELKHART, KOSCIUSKO AND MARSHALL COUNTIES) | $26.50 | $18.33 | $44.83 |
| ELECTRICIAN (ELKHART, KOSCIUSKO AND MARSHALL COUNTIES) | $46.00 | $29.23 | $75.23 |
| COMMUNICATION TECHNICIAN (ELKHART, KOSCIUSKO AND MARSHALL COUNTIES) | $26.50 | $18.33 | $44.83 |
| ELECTRICIAN (ELKHART, KOSCIUSKO AND MARSHALL COUNTIES) | $46.00 | $29.23 | $75.23 |
| ELECTRICIAN (LAGRANGE COUNTIES) | $40.18 | $23.18 | $63.36 |
| ELECTRICIAN (JASPER, PULASKI, AND STARKE COUNTIES) | $49.00 | $32.89 | $81.89 |
| ELECTRICIAN (NEWTON COUNTY) | $52.00 | $32.85 | $84.85 |
| TELECOMMUNICATION TECHNICIAN: WORK COVERS LOW VOLTAGE INSTALLATION, MAINTENANCE AND REMOVAL OF TELECOMMUNICATION FACILITIES (VOICE, SOUND, DATA AND VIDEO) INCLUDING, TELEPHONE AND DATA INSIDE WIRE, INTERCONNECT, TERMINAL EQUIPMENT, CENTRAL OFFICES, PABX, FIBER OPTIC CABLE AND EQUIPMENT, MICRO WAVES, V/SAT, BYPASS, CATV, WAN (WIDE AREA NETWORKS), LAN (LOCAL AREA NETWORKS), AND ISDN (INTEGRATED SYSTEM DIGITAL NETWORK). WORK DOES NOT COVER ANY WORK WHICH PROPERLY COMES UNDER THE WORK DESCRIPTION OF INSIDE JW (JOURNEYMAN WIREMAN), BUT SHALL COVER THE PULLING OF WIRE IN REACEWAYS, UT NOT THE INSTALLATION OF RACEWAYS. (NEWTON COUNTY) | $41.50 | $31.23 | $72.73 |
| ELEVATOR MECHANIC (JASPER, NEWTON AND PULASKI COUNTIES) A) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B) EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WITH MORE THAN 5 YEARS OF SERVICE; 6% FOR LESS THAN 5 YEARS' SERVICE | $60.17 | $38.44 | $98.61 |
| ELEVATOR MECHANIC (ELKHART, KOSCIUSKO, LAGRANGE, MARSHALL AND STARKE COUNTIES) A) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B) EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WITH MORE THAN 5 YEARS OF SERVICE; 6% FOR LESS THAN 5 YEARS' SERVICE | $62.27 | $38.44 | $100.71 |
| POWER EQUIPMENT OPERATOR GROUP 5 GROUP 5: BOBCATS AND FORKLIFTS (COMMERCIAL OR RESIDENTIAL) (ELKHART, KOSCIUSKO, LAGRANGE AND MARSHALL COUNTIES) | $30.60 | $38.65 | $69.25 |
| POWER EQUIPMENT OPERATOR GROUP 5 FORKLIFTS (JASPER, NEWTON, PULASKI & STARKE COUNTIES) | $35.95 | $38.65 | $74.60 |
| POWER EQUIPMENT OPERATOR GROUP 4: BOBCAT (UP TO AND INCLUDING 3/4 CU. YD.). COMPRESSOR (OVER 210 CU. FT. AND LESS THAN 600 CU. FT.), GENERATOR (OVER 50 KW.), HEATERS, MECHANICAL, HOISTS (ALL ELEVATOR, PERMANENT INSTALLATION), HOIST (AUTOMATIC), HOIST (TUGGER SINGLE DRUM), OILERS, PUMPS, WELL POINTS AND ELECTRIC SUBMERSIBLE, SMALL RUBBER TIRED END LOADERS (1/4 CU. YD. AND UNDER), TRACTORS (FARM TYPE) WELDING MACHINES (2 THROUGH 8). (ELKHART, KOSCIUSKO, LAGRANGE AND MARSHALL COUNTIES) | $33.20 | $38.65 | $71.85 |
| POWER EQUIPMENT OPERATOR GROUP 4 HEATERS, MECHANICAL (1 TO 5), OILERS, SWITHMEN, BULL GANG (CRANE ERECTION CREW). (JASPER, NEWTON, PULASKI & STARKE COUNTIES) | $41.40 | $38.65 | $80.05 |
| POWER EQUIPMENT OPERATOR GROUP 3: BUCK HOIST, COMBINATION (SMALL EQUIPMENT OPERATOR), CONVEYOR (PORTABLE), GROUTING MACHINE, HOIST ELEVATORS (MATERIAL AND PERSONNEL), HYDRAULIC POWER UNITS, GROUTING AND PILE DRIVING, STUD WELDER, TRENCHING MACHINES LESS THAN 12 INCHES IN WIDTH, WELDING MACHINES (8 THROUGH 15). (ELKHART, KOSCIUSKO, LAGRANGE AND MARSHALL COUNTIES) | $34.00 | $38.65 | $72.65 |
| POWER EQUIPMENT OPERATOR GROUP 3 CONCRETE MIXER (2 BAG AND OVER), CONVEYOR, PORTABLE, STEAM GENERATORS, TRACTORS (FARM AND SIMILAR TYPE), AIR COMPRESSOR (SMALL 150 AND UNDER - 1 TO 5 TO EXCEED A TOTAL OF 300 FT., AIR COMPRESSOR (LARGE OVER 150), COMBINATION (SMALL EQUIPMENT OPERATOR), FORKLIFT (UNDER 10 TONS), GENERATOR, PUMPS (1 TO 3 NOT TO EXCEED A TOTAL OF 300 FT., PUMPS (WELL POINTS), WELDING MACHINES (2 THROUGH 5, WINCHES (4 ELECTRIC DRILL WINCHES). (JASPER, NEWTON, PULASKI & STARKE COUNTIES) | $43.60 | $38.65 | $82.25 |
| POWER EQUIPMENT OPERATOR GROUP 2: AIR COMPRESSOR (600 CU. FT. AND OVER), BOB CAT (OVER 3/4 CU. YD.), BOILERS, BROOM (ALL POWERED PROPELLED), BULL DOZERS WITH ENGINES LESS THAN 140 NET HORSEPOWER, COMBINATION BACKHOE FRONTEND MACHINE 1/2 CU YD BACKHOE BUCKET OIR UNDER OR WITH ATTACHMENTS COMPRESSOR AND THROTTLE VALVE, CONCRETE BREAKER (TRUCK MOUNTED), CONCRETE MIXER (OF MOORE THAN 21 CU. FT. CAPACITY), FORKLIFT (WITH FIXED OR TILT MAST), GREASER, HIGHLIFT SHOVEL OR FRONTEND LOADER (3 YD BUCKET AND UNDER), HOISTS (1 DRUM), HYDRULIC BOOM TRUCK, POST HOLE DIGGER (VEHICLE MOUNTED), PUMPS CRETES (SQUEZE CRETE TYPE PUMPS, GYPSUM BULKER AND PUMP), ROLLERS (ALL), STEAM GENERATORS, STONE CRUSHERS, STRADDLE BUGGIES, TRACTORS, WINCH TRUCKS (WITH "A" FRAME). (ELKHART, KOSCIUSKO, LAGRANGE AND MARSHALL COUNTIES) | $34.80 | $38.65 | $73.45 |
| POWER EQUIPMENT OPERATOR GROUP 2 AIR COMPRESSORS (30 FEEDING AND COMMON RECEIVERS, ASPHALT SPREADER, BOILERS, BULLDOZERS, COMBINATION BACKHOE-END LOADER WITH BACKHOE BUCKET 1/2 CU. FT. AN UNDER, GRADER-ELEVATING, GREASER ENGINEER, GUARD RAIL POST DRIVER, GROUTING MACHINES; HIGHLIFT SHOVELS OR FRONT ENDLOADER HOIST (AUTOMATIC), CORBOY DRILLING MACHINES, HOIST (ALL ELEVATORS), HOISTS DRAWN, STONE CRUSHERS, TOUNAPULL, WINCH TRUCKS, TUGGER SINGLE FRUM, POST HOLE DIGGER, ROLLERS (ALL), SCOOPS, TRACTOR DRAWN . (JASPER, NEWTON, PULASKI & STARKE COUNTIES) | $47.90 | $38.65 | $86.55 |
| POWER EQUIPMENT OPERATOR GROUP 1: MECHANIC, ASPHALT PLANT, ASPHLAT SPREADER, AUTO GRADER; BATCH PLANT, BENOTO (REQUIRES 2 ENGINEERS), BOILER AND THROTTLE VALVE, BORING MACHINE (ROAD), BULLDOZERS WITH ENGINES OF 140NET HORSEPOWER OR MORE, CAISSON RIGS, CENTRAL REDI-MIX PLANT, CONCRETE CONVEYOR SYSTEMS, CONCRETE PAVER (OVER 27E CU. FT.), CONCTETE PAVER (27E CU. FT. AND UNDER), CONCRETE PLACER, CONCRETE PLACING BOOM, CONCRETE PUMPS (TRUCK MOUNTED), CONCRETE TOWER, CRANES AND BACKHOES (ALL ATTACHMENTS), CRANES, HAMMERHEAD, CRETER CRANE, DERRICKS (ALL), FORKLIFT (CAPBLE OF HOISTING AND MECHANICALLY MOVING FORKS HORIZONTALLY), GRADER, ELEVATING, HIGHLIFT SHOVELS OR FRONT END LOADERS, HOISTS (2 OR MORE DRUMS), LAZER SCREED, LOCOMOTIVES (ALL), MOTOR PATROL, PILE DRIVERS AND SKID RIG, PRE-STRESS MACHINES, ROCK DRILL (SELF- PROPELLED), ROCK DRILL (TRUCK MOUNTED), SCOOPS (TRACTOR DRAWN), SLIP-FORM PAVER, TOURNAPULL, TRACTOR WITH BOOM & SIDE BOOM, TRENCHING MACHINE (12 OR MORE INCHES IN WIDTH), COMBINATION BACKHOE FRONT END LOADER MACHINE WITH 1/2 CU. YD. OR ATTACHMENTS. (ELKHART, KOSCIUSKO, LAGRANGE AND MARSHALL COUNTIES) | $36.15 | $38.65 | $74.80 |
| POWER EQUIPMENT OPERATOR GROUP 1 MECHANIC, ASPHALT PLANT, AUTO GRADER; BATC PLANT, BENOTO (REQUIRES 2 ENGINEERS), BOILER AND THROTTLE VALVE, BORING MACHINE, (MINING MACHINE CAISSON RIGS, CENTRAL REDI-MIX PLANT, COMBINATION BACKHOE, ENDLOADER WITH BACKHOE BUCKET OVER 1/2 CU. YD., COMBINATION TUGGER HOIST AND AIR COMPRESSOR, COMPRESSOR AND THROTTLE, CONCRETE BREAKER (TRUCK MOUNTED), CONCRETE CONVEYOR (TRUCK MOUNTED), CONCRETE PAVER 27E CU. FT. AND UNDER, CONCRETE PAVER OVER 27E CU. FT., CONCRETE PUMP/GROUT PUMP WITH BOOM (TRUCK MOUNTED), CONCRETE TOWER, CRANES AND BACKHOES (ALL), CRANES, HAMMERHEAD TOWER, CRETE CRANE, DERRICKS (ALL), DERRICKS (TRAVELING) FORKLIFT, LULL TYPE, FORKLIFT (10 TON & OVER, HOIST 1, 2, AND 3 DRUMS, HOIST, 2 TUGGER ONE FLOOR, HYDRAULIC BOOM TRUCK, :ASER SCREED, LOCOMOTIVES, ALL MOTOR PATROL, MUCKING MACHINE, PILE DRIVING & SKID RIG, PIT MACHINES, PRE-STRESS MACHINES, PUMP CRETES & SIMILAR TYPES, ROCK DRILL (SELF- PROPELLED), ROCK DRILL (TRUCK MOUNTED), SLIP-FORM PAVER, STRADDLE BUGGIES, TRACTOR WITH BOOM & SIDE BOOM, TRENCHING MACHINE, WINCH TRACTOR (JASPER, NEWTON, PULASKI & STARKE COUNTIES) | $48.70 | $38.65 | $87.35 |
| IRONWORKER (JASPER (SOUTHEASTERN 1/2), NEWTON (SOUTHERN HALF), PULASKI (REMAINDER OF COUNTY)) THE FOLLOWING HOLIDAYS SHALL BE OBSERVED: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY. ANY HOLIDAY WHICH OCCURS ON A SUNDAY SHALL BE OBSERVED THE FOLLOWING MONDAY, UNLESS THE LEGAL OBSERVANCE OF THESE HOLIDAYS IS CHANGED BY LAW | $38.00 | $26.39 | $64.39 |
| IRONWORKER (KOSCIUSKO (REMAINDER OF COUNTY) AND LAGRANGE (REMAINDER OF COUNTY)) | $35.40 | $26.92 | $62.32 |
| IRONWORKER (ELKHART, KOSCIUSKO (NORTHWEST HALF EXCLUDING WARSAW), LAGRANGE (WESTERN HALF ENCLUDING CITY OF LAGRANGE), MARSHALL, MIAMI (NORTHWESTERN TIP), NOBLE (NORTHWESTERN TIP), PULASKI (NORTHEAST HALF), AND STARKE COUNTIES) | $39.76 | $25.00 | $64.76 |
| IRONWORKER: SHEETER (JASPER (NORTHERN 1/2), NEWTON (NORTHERN 1/2), PULASKI (NORTHWESTERN TIP) COUNTIES) | $48.00 | $41.28 | $89.28 |
| IRONWORKER (JASPER (NORTHERN 1/2), NEWTON (NORTHERN 1/2), PULASKI (NORTHWESTERN TIP) COUNTIES) | $47.75 | $41.28 | $89.03 |
| LABORERS: GROUP 3 DYNAMITE MEN; DRILLERS, AIR TRACK OR WAGON DRILLING FOR EXPLOSIVES; LABORER SPECIALIST (JASPER AND NEWTON COUNTIES) | $40.89 | $30.30 | $71.19 |
| LABORERS: GROUP 2 PLASTER TENDERS, MASONS TENDERS; MORTAR MIXERS; WELDERS (ACETYLENE OR ELECTRIC); CUTTING TORCH OR BURNER; CEMENT NOZZLE; CEMENT GUN; SCAFFOLD BUILDERS WHEN WORKING FOR PLASTERERS, AND MASON; WATER BLAST MACHINE OPERATOR; AIR TOOL OPERATORS AND ALL PHEUMATIC TOOL OPERATORS; AIR AND ELECTRIC VIBRATORS AND CHIPPING HAMMER OPERATORS; ASBESTOS REMOVAL; HAZARDOUS WASTE REMOVAL (JASPER AND NEWTON COUNTIES) | $40.64 | $30.30 | $70.94 |
| TRUCK DRIVER: GROUP 4 SEMI TRAILER TRUCKS (ELKHART, KOSCIUSKO, LAGRANGE & MARSHALL COUNTIES) | $34.75 | $0.00 | $34.75 |
| TRUCK DRIVER: GROUP 3 TANDEM, TRIAXLE AND FUEL TRUCKS (ELKHART, KOSCIUSKO, LAGRANGE & MARSHALL COUNTIES) | $34.25 | $0.00 | $34.25 |
| TRUCK DRIVER: GROUP 2 SINGLE AXLE TRUCKS (ELKHART, KOSCIUSKO, LAGRANGE & MARSHALL COUNTIES) | $33.95 | $0.00 | $33.95 |
| LABORERS: GROUP 3 DYNAMITE MEN; DRILLERS, AIR TRACK OR WAGON DRILLING FOR EXPLOSIVES; LABORER SPECIALIST (STARKE COUNTY) | $40.89 | $30.30 | $71.19 |
| LABORERS: GROUP 2 PLASTER TENDERS, MASONS TENDERS; MORTAR MIXERS; WELDERS (ACETYLENE OR ELECTRIC); CUTTING TORCH OR BURNER; CEMENT NOZZLE; CEMENT GUN; SCAFFOLD BUILDERS WHEN WORKING FOR PLASTERERS, AND MASON; WATER BLAST MACHINE OPERATOR; AIR TOOL OPERATORS AND ALL PHEUMATIC TOOL OPERATORS; AIR AND ELECTRIC VIBRATORS AND CHIPPING HAMMER OPERATORS; ASBESTOS REMOVAL; HAZARDOUS WASTE REMOVAL (STARKE COUNTY) | $40.64 | $30.30 | $70.94 |
| LABORERS: GROUP 1 BUILDING AND CONSTRUCTION LABORERS; SCAFFOLD BUILDERS (OTHER THAN FOR MASON OR PLASTERERS); MECHANIC TENDERS; RODMEN AND CHAINMEN, RAILROAD WORKERS, MASONRY WALL WORKERS, (INTERIOR & EXTERIOR); ROOFER TENDERS, CEMENT FINISHER TENDERS, CARPENTER TENDERS, PORTABLE WATER, PUMPS WITH DISCHARGE UP TO 3 INCHES; WATERPROOFING; HAULING OF CREOSOTE LUMBER OR LUTEMEN; ASPHALT RAKERS; KETTLEM, EARTH COMPACTORS; JACKMAN AND SHEETMEN IN DITCHES MORE THAN 6 FT. DEEP; LABORERS IN DITCHES 6' DEEP OR DEEPER; ASSEMBLY OF UNCRETE PUMP; TILE LAYERS (SEWER OR FIELD); SEWER PIPE LAYERS; MOTOR DRIVEN WHEELBARROWS AND CONCRETE BUGGIES; HYSTER OPERATOR; PUMP CRETE ASSEMBLERS; CORE DRILL OPERATOR; CEMENT, LINE OR SILICA CLAY HANDERS; HANDLING OF TOXIC MATERIALS DAMAGING TO CLOTHING; PNEUMATIC SPIKERS; DECK ENGINE AND WINCH OPERATOR; WATER MAIN AND CABLE DUCKING; SCREED MAN OR SCREW OPERATOR ON ASPHALT PAVER; CHAIN SAW AND DEMOLITION SAW OPERATOR; CONCRETE CONVEYOR ASSEMBLER. (STARKE COUNTY) | $39.89 | $30.30 | $70.19 |
| LABORERS: GROUP 3 DYNAMITE MEN; DRILLERS, MASON TENDERS; AIR TRACK OR WAGON DRILLING FOR EXPLOSIVES; LABORER SPECIALIST. (PULASKI COUNTY) | $28.48 | $18.00 | $46.48 |
| LABORERS: GROUP 2 PLASTER TENDERS, MORTAR MIXERS; WELDERS (ACETYLENE OR ELECTRIC); CUTTING TORCH OR BURNER; CEMENT NOZZLE; CEMENT GUN; SCAFFOLD BUILDERS WHEN WORKING FOR PLASTERERS, AND MASON; WATER BLAST MACHINE OPERATOR; AIR TOOL OPERATORS AND ALL PHEUMATIC TOOL OPERATORS; AIR AND ELECTRIC VIBRATORS AND CHIPPING HAMMER OPERATORS; ASBESTOS REMOVAL; HAZARDOUS WASTE REMOVAL. (PULASKI COUNTY) | $27.73 | $18.00 | $45.73 |
| LABORERS: GROUP 1 BUILDING AND CONSTRUCTION LABORERS; SCAFFOLD BUILDERS (OTHER THAN FOR MASON OR PLASTERERS); MECHANIC TENDERS; RODMEN AND CHAINMEN, RAILROAD WORKERS, MASONRY WALL WORKERS, (INTERIOR & EXTERIOR); ROOFER TENDERS, CEMENT FINISHER TENDERS, CARPENTER TENDERS, PORTABLE WATER, PUMPS WITH DISCHARGE UP TO 3 INDCHES; WATERPROOFING; HAULING OF CREOSOTE LUMBER OR LUTEMEN; ASPHALT RAKERS; KETTLEM, EARTH COMPACTORS; JACKMAN AND SHEETMEN IN DITCHES MORE THAN 6 FT. DEEP; LABORERS IN DITCHES 6'DEEP OR DEEPER; ASSEMBLY OF UNCRETE PUMP; TILE LAYERS (SEWER OR FIELD); SEWER PIPE LAYERS; MOTOR DRIVEN WHEELBARROWS AND CONCRETE BUGGIES; HYSTER OPERATOR; PUMP CRETE ASSEMBLERS; CORE DRILL OPERATOR; CEMENT, LINE OR SILICA CLAY HANDERS; HANDLING OF TOXIC MATERIALS DAMAGING TO CLOTHING; PNEUMATIC SPIKERS; DECK ENGINE AND WINCH OPERATOR; WATER MAIN AND CABLE DUCKING; SCREED MAN OR SCREW OPERATOR ON ASPHALT PAVER; CHAIN SAW AND DEMOLITION SAW OPERATOR; CONCRETE CONVEYOR ASSEMBLER. (PULASKI COUNTY) | $26.98 | $18.00 | $44.98 |
| LABORERS: BUILDING CONSTRUCTION: GROUP 3 WATER BLAST MACHINE OPERATOR; MORTAR MIXERS; WELDERS (ACETYLENE OR ELECTRIC); CUTTING TORCH OR BURNER; CEMENT NOZZLE. LABORERS; CEMENT GUN OPERATOR; SCAFFOLD BUILDERS WHEN WORKING FOR PLASTERERS. DYNAMITE MEN; DRILLERS - AIR TRACK OR WAGON DRILLING FOR EXPLOSIVES HAZARDOUS AND TOXIC MATERIAL HANDLER, MASON TENDERS, ASBESTOS REMOVAL OR HANDLER. (REMAINING COUNTIES) | $31.88 | $18.70 | $50.58 |
| LABORERS: BUILDING CONSTRUCTION: GROUP 2 WATERPROOFING; HANDLING OF CREOSOT LUMBER OR LIKE TREATED MATERIAL (EXCLUDING RAILROAD MATERIAL); ASPHALT RAKERS AND LUTEMEN; KETTLEMEN; AIR TOOL OPERATORS AND ALL PNEUMATIC TOOL OPERATORS; AIR AND ELECTRIC VIBRATORS AND CHIPPING HAMMER OPERATORS; EARTH COMPACTORS JACKMEN AND SHEETMEN WORKING DITCHES DEEPER THAN (6) FT.IN DEPTH; LABORERS WORKING IN DITCHES (6) FT.IN DEPTH OR DEEPER; ASSEMBLY OF UNICRETE PUMP; TILE LAYERS (SEWER OR FIELD) AND SEWER PIPE LAYER (METALLIC OR NON-METALLIC); MOTOR DRIVEN WHEELBARROWS AND CONCRETE BUGGIES; HYSTER OPERATORS; PUMP CRETE ASSEMBLERS; CORE DRILL OPERATORS; CEMENT, LIME OR SILICA CLAY HANDLERS (BULK OR BAG); HANDLING OF TOXIC MATERIALS DAMAGING TO CLOTHING; PNEUMATIC SPIKERS; DECK ENGINE AND WINCH OPERATORS; WATER MAIN AND CABLE DUCKING (METALLIC AND NON-METALLIC); SCREED MAN OR SCREW OPERATOR ON ASPHALT PAVER; CHAIN AND DEMOLITION SAW OPERATORS; CONCRETE CONVEYOR ASSEMBLERS. (REMAINING COUNTIES) | $30.38 | $18.70 | $49.08 |
| LABORERS: BUILDING CONSTRUCTION: GROUP 1 BUILDING AND CONSTRUCTION LABORERS; SCAFFOLD BUILDERS (OTHER THAN FOR PLASTERERS); MECHANIC TENDERS; WINDOW WASHERS AND CLEANERS; WATERBOYS AND TOOLHOUSEMEN; ROOFERS TENDERS; RAILROAD WORKERS; MASONRY WALL WASHERS (INTERIOR AND EXTERIOR); CEMENT FINISHER TENDERS; CARPENTER TENDERS; ALL PORTABLE WATER PUMPS WITH DISCHARGE UP TO (3) INCHES; PLASTER TENDERS; FLAG & SIGNAL PERSON. (REMAINING COUNTIES) | $29.88 | $18.70 | $48.58 |
| GLAZIER (NEWTON COUNTY, WEST OF HIGHWAY #41) | $53.55 | $44.88 | $98.43 |
| PAINTER: SPRAY | $33.00 | $19.86 | $52.86 |
| PAINTER (BRUSH & ROLLER, DRYWALL TAPING & FINISHING, VINYL/PAPER HANGING) | $32.50 | $19.86 | $52.36 |
| PAINTERS: DRYWALL FINISHER (JASPER, NEWTON, PULASKI AND STARKE COUNTIES) | $41.80 | $31.26 | $73.06 |
| PAINTERS: BRUSH & ROLLER (JASPER, NEWTON, PULASKI AND STARKE COUNTIES) | $41.00 | $31.26 | $72.26 |
| PAINTERS: SPRAY, SANDBLAST, POWER TOOLS, WATERBLAST, & STEAM CLEANING (LAGRANGE COUNTY) | $27.04 | $16.27 | $43.31 |
| PAINTERS: SPRAY & SANDBLAST POT TENDERS AND GROUND PERSONNEL (LAGRANGE COUNTY) | $27.04 | $16.27 | $43.31 |
| PAINTERS: LEAD ABATEMENT (LAGRANGE COUNTY) | $32.24 | $16.27 | $48.51 |
| PAINTERS: BRUSH, ROLLER, PAPERHANGER, & DRYWALL FINISHING (LAGRANGE COUNTY) | $25.04 | $15.32 | $40.36 |
| GLAZIER (JASPER, NEWTON (EAST OF HIGHWAY #41)) | $44.09 | $30.73 | $74.82 |
| GLAZIER (ELKHART, KOSCIUSKO, LAGRANGE, MARSHALL, PULASKI, AND STARKE COUNTY) | $34.22 | $24.67 | $58.89 |
| PLASTERER (MARSHALL COUNTY AND PULASKI (SOUTHERN 1/2)) | $26.81 | $12.40 | $39.21 |
| CEMENT MASON/CONCRETE FINISHER (MARSHALL COUNTY AND PULASKI (SOUTHERN 1/2)) | $28.84 | $14.48 | $43.32 |
| PLASTERER (MARSHALL COUNTY AND PULASKI (SOUTHERN 1/2)) | $26.81 | $12.40 | $39.21 |
| CEMENT MASON/CONCRETE FINISHER (MARSHALL COUNTY AND PULASKI (SOUTHERN 1/2)) | $28.84 | $14.48 | $43.32 |
| PLASTERER (ELKHART, KOSCIUSKO AND LAGRANGE COUNTIES) | $25.69 | $11.75 | $37.44 |
| CEMENT MASON/CONCRETE FINISHER (ELKHART, KOSCIUSKO AND LAGRANGE COUNTIES) | $28.84 | $14.48 | $43.32 |
| PLASTERER (ELKHART, KOSCIUSKO AND LAGRANGE COUNTIES) | $25.69 | $11.75 | $37.44 |
| CEMENT MASON/CONCRETE FINISHER (ELKHART, KOSCIUSKO AND LAGRANGE COUNTIES) | $28.84 | $14.48 | $43.32 |
| CEMENT MASON/CONCRETE FINISHER (NEWTON COUNTY) | $37.28 | $18.53 | $55.81 |
| PLASTERER (NEWTON COUNTY) | $32.70 | $17.70 | $50.40 |
| CEMENT MASON/CONCRETE FINISHER (NEWTON COUNTY) | $37.28 | $18.53 | $55.81 |
| PLASTERER (NEWTON COUNTY) | $32.70 | $17.70 | $50.40 |
| CEMENT MASON/CONCRETE FINISHER (JASPER (REMAINDER OF COUNTY, INCLUDING WHEATFIELD), PULASKI (N 1/2) AND STARKE COUNTIES) | $35.48 | $21.68 | $57.16 |
| PLASTERER (JASPER (REMAINDER OF COUNTY, INCLUDING WHEATFIELD), PULASKI (N 1/2) AND STARKE COUNTIES) | $33.28 | $17.32 | $50.60 |
| CEMENT MASON/CONCRETE FINISHER (JASPER (REMAINDER OF COUNTY, INCLUDING WHEATFIELD), PULASKI (N 1/2) AND STARKE COUNTIES) | $35.48 | $21.68 | $57.16 |
| PLASTERER (JASPER (REMAINDER OF COUNTY, INCLUDING WHEATFIELD), PULASKI (N 1/2) AND STARKE COUNTIES) | $33.28 | $17.32 | $50.60 |
| CEMENT MASON/CONCRETE FINISHER (PULASKI (NORTHERN 2/3), JASPER (N. EASTERN PORTION OF, WEST TO, BUT NOT INCLUDING WHEATFIELD), STARKE (ENTIRETY)) | $36.01 | $25.40 | $61.41 |
| PLUMBER (ELKHART, KOSCIUSKO, AND LAGRANGE COUNTIES) | $45.06 | $23.16 | $68.22 |
| PLUMBER, PIPEFITTER, STEAMFITTER (JASPER (S OF THE N. SIDE OF THE CITY OF RENSSELEAR), MARSHALL, PULASKI AND STARKE COUNTIES) | $44.93 | $23.03 | $67.96 |
| PLUMBER (JASPER (TO THE CITY OF RENSSELAER) AND NEWTON COUNTIES) | $49.77 | $28.56 | $78.33 |
| PIPEFITTER (JASPER (EXCLUDING THE CITY LIMITS OF RENSSELEAR), AND NEWTON (ENTIRE COUNTY)) | $48.50 | $31.12 | $79.62 |
| ROOFER: SLATE & TILE (ELKHART, KOSCIUSKO, LAGRANGE, MARSHALL, PULASKI, AND STARKE COUNTIES) | $36.05 | $21.04 | $57.09 |
| ROOFER: COMPOSITION (ELKHART, KOSCIUSKO, LAGRANGE, MARSHALL, PULASKI, AND STARKE COUNTIES) | $34.55 | $21.04 | $55.59 |
| ROOFER (JASPER AND NEWTON COUNTIES) | $47.47 | $27.81 | $75.28 |
| SPRINKLER FITTER | $44.20 | $27.88 | $72.08 |
| SHEET METAL WORKER (ELKHART, KOSCIUSKO, & MARSHALL) | $44.45 | $30.43 | $74.88 |
| TRUCK DRIVERS: GROUP 5 MECHANIC FURNISHING HIS OWN TOOLS. (JASPER AND NEWTON COUNTIES) | $34.02 | $0.00 | $34.02 |
| TRUCK DRIVERS: GROUP 4 DRIVERS ON HEAVY EQUIPMENT OVER SIXTEEN (16) CU.YDS. OR TWENTY-FOUR TON, SUCH AS KOEHRING OR SIMILAR DUMPSTERS, TRACT TRUCKS, EUCLIDS, HUG BOTTOM DUMPS, TROUNAPULLS, TOURNAROCKERS OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES, POLE TRAILERS OVER SIX (6) WHEELS, WATER PULLS, LOW-BOY TRAILERS, TANDEM AXLES, QUAD AXLE OR MORE NO-WEIGHT LIMITATION, DISEAL AND/OR HEAVY EQUIPMENT MECHANICS WHEN WORKING ON EQUIPMENT OPERATED BY EMPLOYEES WITH THIS BARGAINING UNIT. (JASPER AND NEWTON COUNTIES) | $33.52 | $0.00 | $33.52 |
| TRUCK DRIVERS: GROUP 3 KOEHRING OR SIMILAR DUMPSTERS, TRACT TRUCKS, SEMI-TRAILER WATER TRUCKS, EUCLIDS, HUG BOTTOM DUMPS, TOURNAPULLS, TOURNATRAILERS, TOURNAROCKERS, TRACTOR-TRAILERS, TANDEMS Q-FRAME WINCH TRUCKS, HYDROLIFT TRUCKS OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES, MIXER TRUCKS OVER SIX AND ONE-HALF (6 1/2) CU.YDS. BATCH TRUCKS WET OR DRY OVER 4 - "34-E" BATCHES SINGLE AXLE LOW BOY TRAILERS, AND CONTRACTOR'S MECHANICS WHEN WORKING ON EQUIPMENT OPERATED BY EMPLOYEES WITHIN THIS BARGAINING UNIT. SIX (6) WHEEL POLE TRAILERS AND ONE (1) MAN OIL DISTRIBUTORS, FORK-LIFT OVER FOUR (4) TON AND MOBILE MIXERS. (JASPER AND NEWTON COUNTIES) | $33.37 | $0.00 | $33.37 |
| TRUCK DRIVERS: GROUP 2 DRIVERS ON TANDEM AXLE EIGHTEEN (18) CU.YDS. OR TWENTY-FOUR (24) TONS GROSS, SIX (6) WHEEL TRUCKS, KOEHRING OR SIMILAR DUMPSTERS, TRACT RUCKS, EUCLIDS, HUG BOTTOM DUMPS, TOURNAPULLS, TOURNATRAILERS, TROURNAROCKERS, OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES UNDER NINE (9) CU.YDS. OR LESS THAN THIRTEEN AND ONE-HALF (13 1/2) TONS, TANDEMS AND SEMI-TRAILER SERVICE TRUCKS, MIXER TRUCKS OVER THREE (3) CU.YDS.,FORK LIFT, FOUR (4) WHEEL A-FRAME TRUCKS WHEN USED FOR TRANSPORTATION PURPOSES, FOUR (4) WHEEL WINCH TRUCKS, PAVEMENT BREAKERS, BATCH TRUCKS-WET OR DRY-OVER 2 UP TO AND INCLUDING 4 - "34-E" BATCHES TWO (2) MEN OIL DISTRIBUTORS, FORK-LIFT UNDER FOUR (4) TON AND VACUUM TRUCKS. (JASPER AND NEWTON COUNTIES) | $33.17 | $0.00 | $33.17 |
| TRUCK DRIVERS: GROUP 1 SINGLE AXLE TRUCKS SEVEN (7) CU.YDS. OR LESS THAN TEN AND ONE-HALF (10 1/2/) TONS, DUMPSTERS, SCOOP-MOBILES FIVE (5) CU.YDS. AND UNDER OR LESS THAN SEVEN AND ONE-HALF (7 1/2) TONS, MIXER TRUCKS THREE (3) CU.YDS. AND UNDER, AIR COMPRESSORS AND WELDING MACHINES, INCLUDING THOSE PULLED BY SEPARATE UNITS, BATCH TRUCKS-WET OR DRY-2 "34-E" BATCHES OR LESS, TRUCK DRIVER HELPERS, WAREHOUSEMEN, MECHANIC'S HELPERS, GREASERS AND TIREMEN, ALL PICK- UP TRUCKS AND OTHER VEHICLES. DRIVERS ON DUMPSTERS OR SIMILAR DUMPSTERS, MOUNTED ON FOUR (4) WHEEL TRUCK RATED TWO (2) CU.YDS. OR LESS, AND SMALL PALLET TYPE FORK-LIFT OPERATOR AND DRIVERS ON PALLET JACKS OR SIMILAR TYPE EQUIPMENT. (JASPER AND NEWTON COUNTIES) | $32.67 | $0.00 | $32.67 |
| TRUCK DRIVER: GROUP 1 PICKUP TRUCKS (ELKHART, KOSCIUSKO, LAGRANGE & MARSHALL COUNTIES) | $33.75 | $0.00 | $33.75 |