IL20260009: rev 1 → rev 2

5 rate change(s), 3 added, 3 removed.

Rate changes

Rates below include fringe (the full hourly package). Enter your remaining crew hours per classification to price this change for a job.

ClassificationOld totalNew totalΔ/hrHours on jobCost impact
BOILERMAKER$86.60$91.64+5.04
LINE CONSTRUCTION: GROUNDMAN$108.49$77.53-30.96
LINE CONSTRUCTION (LINEMAN AND EQUIPMENT OPERATOR)$122.15$99.39-22.76
ELEVATOR MECHANIC$109.12$109.12+0.00
SPRINKLER FITTER$99.75$99.750.00

Added classifications

FIRE STOP TECHNICIAN$44.02$32.76
CARPENTER: CARPENTER, LATHER, MILLWRIGHT, PILEDRIVER, AND SOFT FLOOR LAYER (Heavy & Highway)$52.01$38.85
LABORER, BUILDING & RESIDENTIAL: GROUP 1 BUILDING LABORERS; PLASTERER TENDERS; PUMPS FOR DEWATERING; AND OTHER UNCLASSIFIED LABORERS$51.40$36.94

Removed classifications

ASBESTOS WORKER/INSULATOR Fire Stop Technicianwas $44.02
CARPENTER - Heavy & Highwaywas $52.01
LABORER (BUILDING & RESIDENTIAL) - GROUP 1was $51.40