IL20260002: rev 3 → rev 4
13 rate change(s), 14 added, 11 removed.
Rate changes
Rates below include fringe (the full hourly package). Enter your remaining crew hours per classification to price this change for a job.
| Classification | Old total | New total | Δ/hr | Hours on job | Cost impact |
|---|---|---|---|---|---|
| ELEVATOR MECHANIC | $98.61 | $98.61 | +0.00 | — | |
| ELEVATOR MECHANIC | $96.43 | $96.43 | +0.00 | — | |
| ELEVATOR MECHANIC (ALEXANDER, CLAY, EDWARDS, FRANKLIN, GALLATIN, HAMILTON, HARDIN, JACKSON, JEFFERSON, JOHNSON, LAWRENCE, MARION, MASSAC, PERRY, POPE, PULASKI, RICHLAND, SALINE, UNION, WABASH, WAYNE, WHITE AND WILLIAMSON COUNTIES) | $101.16 | $101.17 | +0.00 | — | |
| TRUCK DRIVER, GROUP 1 DRIVERS ON 2 AXLE TRUCKSHAULING LESS THAN 9 TON; AIR COMPRESSOR AND WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS; TRUCK DRIVER HELPERS; WAREHOUSE EMPLOYEES; MECHANIC HELPERS; GREASERS AND TIREMEN; FORK LIFTS UP TO 6,000 POUNDS CAPACITY (CLARK, CRAWFORD, EDGAR, EDWARDS, LAWRENCE, RICHLAND, AND WABASH COUNTIES) | $54.66 | $62.31 | +7.65 | — | |
| TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (CLARK, CRAWFORD, EDGAR, EDWARDS, LAWRENCE, RICHLAND, AND WABASH COUNTIES) | $55.55 | $62.31 | +6.76 | — | |
| TRUCK DRIVER: 2 OR 3 AXLES (IROQUOIS COUNTY (ALL EXCEPT THE TOWNSHIPS OF MILFORD, STOCKLAND, LODA, PIGEON GROVE, FOUNTAIN CREEK, LOVEJOY, AND PRAIRIE GREEN)) | $45.07 | $1055.60 | +1010.53 | — | |
| TRUCK DRIVER: 4 AXLES (IROQUOIS COUNTY (ALL EXCEPT THE TOWNSHIPS OF MILFORD, STOCKLAND, LODA, PIGEON GROVE, FOUNTAIN CREEK, LOVEJOY, AND PRAIRIE GREEN)) | $45.22 | $1055.60 | +1010.38 | — | |
| TRUCK DRIVER: 5 AXLES (IROQUOIS COUNTY (ALL EXCEPT THE TOWNSHIPS OF MILFORD, STOCKLAND, LODA, PIGEON GROVE, FOUNTAIN CREEK, LOVEJOY, AND PRAIRIE GREEN)) | $45.42 | $1055.60 | +1010.18 | — | |
| TRUCK DRIVER: 6 AXLES (IROQUOIS COUNTY (ALL EXCEPT THE TOWNSHIPS OF MILFORD, STOCKLAND, LODA, PIGEON GROVE, FOUNTAIN CREEK, LOVEJOY, AND PRAIRIE GREEN)) | $45.62 | $1055.60 | +1009.98 | — | |
| TRUCK DRIVER: 2 OR 3 AXLE TRUCKS (FORD COUNTY (NORTH SECTION THE OF THE COUNTY NORTH OF A LINE FROM THE SOUTHEASTERN CORNER OF LIVINGSTON COUNTY STRAIGHT EAST TO THE FORD-IRQUOIS COUNTY LINE)) | $45.07 | $1055.60 | +1010.53 | — | |
| TRUCK DRIVER: 4 AXLE TRUCKS (FORD COUNTY (NORTH SECTION THE OF THE COUNTY NORTH OF A LINE FROM THE SOUTHEASTERN CORNER OF LIVINGSTON COUNTY STRAIGHT EAST TO THE FORD-IRQUOIS COUNTY LINE)) | $45.22 | $1055.60 | +1010.38 | — | |
| TRUCK DRIVER: 5 AXLE TRUCKS (FORD COUNTY (NORTH SECTION THE OF THE COUNTY NORTH OF A LINE FROM THE SOUTHEASTERN CORNER OF LIVINGSTON COUNTY STRAIGHT EAST TO THE FORD-IRQUOIS COUNTY LINE)) | $45.42 | $1055.60 | +1010.18 | — | |
| TRUCK DRIVER: 6 AXLE TRUCKS (FORD COUNTY (NORTH SECTION THE OF THE COUNTY NORTH OF A LINE FROM THE SOUTHEASTERN CORNER OF LIVINGSTON COUNTY STRAIGHT EAST TO THE FORD-IRQUOIS COUNTY LINE)) | $45.62 | $1055.60 | +1009.98 | — |
Added classifications
| FIRE STOP TECHNICIAN | $44.02 | $32.76 |
| FIRE STOP TECHNICIAN (FORD AND IROQUOIS COUNTIES) | $44.02 | $32.76 |
| ELECTRICAL LOW VOLTAGE WIRING INSTALLER: BUILDING (DEWITT (NORTHSIDE), WESTERN (NORTHSIDE), MCLEAN (SOUTHSIDE), AND WOODFORD (SOUTHSIDE) COUNTIES) | $40.63 | $20.47 |
| ELECTRICAL LOW VOLTAGE WIRING INSTALLER: BUILDING (IROQUOIS (SOUTHEASTERN SIDE), AND VERMILION COUNTIES) | $40.64 | $20.46 |
| OPERATOR: POWER EQUIPMENT: RIVER Class 2 | $36.78 | $32.00 |
| OPERATOR: POWER EQUIPMENT: RIVER (Class 2) | $36.78 | $32.00 |
| CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $44.97 | $0.25 |
| LOW BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $45.37 | $0.25 |
| LOW BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $45.17 | $0.25 |
| LOW BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $44.97 | $0.25 |
| LOW BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $44.82 | $0.25 |
| CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $45.37 | $0.25 |
| CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $45.17 | $0.25 |
| CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $44.82 | $0.25 |
Removed classifications
| ASBESTOS WORKER/INSULATOR Fire Stop Technician | was $44.02 |
| ASBESTOS WORKER/INSULATOR Fire Stop Technician | was $44.02 |
| ELECTRICAL LOW VOLTAGE WIRING INSTALLER - Installation, service and maintenance of low-voltage systems which utilizes the transmission and/or transference of voice, sound, vision, or digital for commercial, education, security and entertainment purposes for the following: TV monitoring and surveillance, background/foreground music, intercom and telephone interconnect, field programming, inventory control systems, microwave transmission, multi-media, multiplex, radio page, school, intercom and sound burglar alarms and low voltage master clock systems | was $40.63 |
| ELECTRICAL LOW VOLTAGE WIRING INSTALLER - Installation, service and maintenance of low-voltage systems which utilizes the transmission and/or transference of voice, sound, vision, or digital for commercial, education, security and entertainment purposes for the following: TV monitoring and surveillance, background/foreground music, intercom and telephone interconnect, field programming, inventory control systems, microwave transmission, multi-media, multiplex, radio page, school, intercom and sound burglar alarms and low voltage master clock systems | was $40.64 |
| OPERATOR: Power Equipment - Class 2 | was $36.78 |
| POWER EQUIPMENT OPERATOR - Group 07 | was $43.80 |
| POWER EQUIPMENT OPERATOR - Group 08 | was $44.10 |
| POWER EQUIPMENT OPERATOR - Group 10 | was $45.25 |
| FOOTNOTE: a | was $46.20 |
| FOOTNOTES: a | was $1055.60 |
| FOOTNOTES: a | was $1055.60 |