Building construction wages: Buchanan + 8 more counties, Iowa
Wage determination IA20260080 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/IA20260080 on · latest revision 1 · verify at sam.gov/wage-determination/IA20260080/1
BuchananButlerChickasawFayetteMitchellWinneshiekFranklinHardinWorth
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $48.48 | $33.91 | $82.39 |
| BRICKLAYER (CHICKASAW, FAYETTE, FRANKLIN, MITCHELL, WINNESHIEK, AND WORTH COUNTIES) | $29.80 | $17.16 | $46.96 |
| BRICKLAYER (BUCHANAN, BUTLER AND HARDIN COUNTIES) | $30.65 | $20.10 | $50.75 |
| ELEVATOR MECHANIC | $56.30 | $38.44 | $94.74 |
| POWER EQUIPMENT OPERATOR: (CLASS 3)- FORKLIFT (OTHER THAN ABOVE) | $35.29 | $18.35 | $53.64 |
| POWER EQUIPMENT OPERATOR: (CLASS 2)- FORKLIFT (USED FOR STEEL ERECTION OR MACHINERY MOVING) | $37.62 | $18.35 | $55.97 |
| IRONWORKER: STRUCTURAL | $35.53 | $24.45 | $59.98 |
| IRONWORKER: ORNAMENTAL | $36.30 | $25.80 | $62.10 |
| LABORER: MASON TENDER - BRICK (BUCHANAN COUNTY) | $22.30 | $17.92 | $40.22 |
| LABORER: MASON TENDER - BRICK (CHICKASAW COUNTY) | $25.17 | $19.82 | $44.99 |
| LABORER: MASON TENDER - BRICK (BUTLER, FRANKLIN, HARDIN, MITCHELL, AND WORTH COUNTIES) | $29.36 | $17.99 | $47.35 |
| PAINTER: BRUSH AND ROLLER | $32.41 | $16.30 | $48.71 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $45.20 | $23.25 | $68.45 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT, AND HVAC UNIT INSTALLATION | $24.11 | $10.14 | $34.25 |
| ROOFER | $15.53 | $4.57 | $20.10 |
| PLUMBER | $25.66 | $9.61 | $35.27 |
| OPERATOR: LOADER | $25.36 | $15.62 | $40.98 |
| OPERATOR: CRANE | $21.51 | $6.41 | $27.92 |
| OPERATOR: BULLDOZER | $22.31 | $8.36 | $30.67 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.14 | $18.26 | $43.40 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $26.64 | $14.47 | $41.11 |
| LABORER: PIPELAYER | $18.00 | $2.70 | $20.70 |
| LABORER: COMMON OR GENERAL | $15.21 | $3.23 | $18.44 |
| IRONWORKER, REINFORCING | $24.43 | $16.24 | $40.67 |
| INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $18.09 | $4.67 | $22.76 |
| ELECTRICIAN | $25.02 | $9.76 | $34.78 |
| CEMENT MASON/CONCRETE FINISHER | $16.99 | $1.73 | $18.72 |
| CAULKER | $17.21 | $8.18 | $25.39 |
| CARPENTER, INCLUDES DRYWALL HANGING, AND FORM WORK | $20.94 | $10.16 | $31.10 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.