Building construction wages: Washington, Iowa
Wage determination IA20260076 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/IA20260076 on · latest revision 1 · verify at sam.gov/wage-determination/IA20260076/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $48.48 | $33.91 | $82.39 |
| BRICKLAYER | $29.80 | $17.16 | $46.96 |
| ELEVATOR MECHANIC | $56.30 | $38.44 | $94.74 |
| POWER EQUIPMENT OPERATOR: (CLASS 3)- LOADER(UNDER 35 H.P.) WITH OR WITHOUT ATTACHMENTS, PAVER(ALL TYPES), ROLLER | $32.62 | $21.94 | $54.56 |
| POWER EQUIPMENT OPERATOR: (CLASS 2)- LOADER | $34.70 | $21.94 | $56.64 |
| POWER EQUIPMENT OPERATOR: (CLASS 1)- BACKHOE/EXCAVATOR/TRACKHOE | $35.02 | $21.94 | $56.96 |
| IRONWORKER: STRUCTURAL | $35.53 | $24.45 | $59.98 |
| IRONWORKER: ORNAMENTAL | $35.53 | $24.45 | $59.98 |
| IRONWORKER: REINFORCING | $37.50 | $30.99 | $68.49 |
| LABORER: PIPELAYER | $28.33 | $19.82 | $48.15 |
| PAINTER: BRUSH AND ROLLER | $29.55 | $12.10 | $41.65 |
| CEMENT MASON/CONCRETE FINISHER | $32.29 | $28.45 | $60.74 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT AND UNIT INSTALLATION) | $41.45 | $23.11 | $64.56 |
| ROOFER | $21.92 | $5.07 | $26.99 |
| PLUMBER | $29.11 | $11.55 | $40.66 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION | $30.25 | $11.88 | $42.13 |
| PAINTER: SPRAY | $19.76 | $9.05 | $28.81 |
| OPERATOR: FORKLIFT | $22.96 | $7.49 | $30.45 |
| OPERATOR: CRANE | $24.15 | $8.10 | $32.25 |
| OPERATOR: BULLDOZER | $26.13 | $13.56 | $39.69 |
| LABORER: MASON TENDER - BRICK | $19.39 | $8.17 | $27.56 |
| LABORER: COMMON OR GENERAL | $16.52 | $4.24 | $20.76 |
| INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $16.70 | $8.12 | $24.82 |
| ELECTRICIAN | $26.06 | $8.14 | $34.20 |
| CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $23.97 | $3.09 | $27.06 |
| BRICKLAYER | $24.90 | $9.60 | $34.50 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.