Building construction wages: Polk, Iowa
Wage determination IA20260071 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/IA20260071 on · latest revision 1 · verify at sam.gov/wage-determination/IA20260071/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $48.48 | $33.91 | $82.39 |
| TILE SETTER | $37.44 | $19.12 | $56.56 |
| BRICKLAYER AND STONEMASON | $37.44 | $19.12 | $56.56 |
| ELECTRICIAN (INCLUDES LOW VOLTAGE WIRING) | $45.45 | $20.94 | $66.39 |
| ELEVATOR MECHANIC | $56.30 | $38.44 | $94.74 |
| POWER EQUIPMENT OPERATOR: (CLASS 3)- LOADER(UNDER 35 H.P.) WITH OR WITHOUT ATTACHMENTS; FORKLIFT(OTHER THAN ABOVE); PAVER(ALL TYPES); ROLLER | $32.62 | $21.94 | $54.56 |
| POWER EQUIPMENT OPERATOR: (CLASS 2)- BULLDOZER; FORKLIFT(ON STEEL ERECTION AND MACHINERY MOVING OR HOISTING ABOVE ONE COMPLETE STORY); LOADER | $34.70 | $21.94 | $56.64 |
| POWER EQUIPMENT OPERATOR: (CLASS 1)- BACKHOE/EXCAVATOR/TRACKHOE | $35.02 | $21.94 | $56.96 |
| IRONWORKER: STRUCTURAL | $37.80 | $23.54 | $61.34 |
| IRONWORKER: ORNAMENTAL | $35.53 | $24.45 | $59.98 |
| IRONWORKER: REINFORCING | $37.50 | $30.99 | $68.49 |
| LABORER: MASON TENDER - BRICK | $29.36 | $17.99 | $47.35 |
| LABORER (COMMON OR GENERAL) | $29.36 | $17.99 | $47.35 |
| PAINTER: BRUSH AND ROLLER | $32.41 | $16.30 | $48.71 |
| CEMENT MASON/CONCRETE FINISHER | $34.55 | $23.83 | $58.38 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $45.20 | $23.25 | $68.45 |
| PLUMBER | $45.20 | $23.25 | $68.45 |
| ROOFER | $32.50 | $15.53 | $48.03 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $45.99 | $26.42 | $72.41 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT AND UNIT INSTALLATION) | $39.38 | $24.95 | $64.33 |
| PAINTER: SPRAY | $19.77 | $6.64 | $26.41 |
| OPERATOR: CRANE | $25.70 | $9.13 | $34.83 |
| LABORER: PIPELAYER | $16.11 | $0.00 | $16.11 |
| INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $18.17 | $4.01 | $22.18 |
| DRYWALL FINISHER/TAPER | $21.25 | $10.32 | $31.57 |
| CARPENTER, INCLUDES DRYWALL HANGING | $24.93 | $11.17 | $36.10 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $33.57 | $20.75 | $54.32 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.