Building construction wages: Polk, Iowa
Wage determination IA20260071 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/IA20260071 on July 24, 2026 · latest revision 1 · verify at sam.gov/wage-determination/IA20260071/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $48.48 | $33.91 | $82.39 |
| TILE SETTER | $37.44 | $19.12 | $56.56 |
| BRICKLAYER AND STONEMASON | $37.44 | $19.12 | $56.56 |
| ELECTRICIAN (INCLUDES LOW VOLTAGE WIRING) | $45.45 | $20.94 | $66.39 |
| ELEVATOR MECHANIC | $56.30 | $38.44 | $94.74 |
| POWER EQUIPMENT OPERATOR: (CLASS 3)- LOADER(UNDER 35 H.P.) WITH OR WITHOUT ATTACHMENTS; FORKLIFT(OTHER THAN ABOVE); PAVER(ALL TYPES); ROLLER | $32.62 | $21.94 | $54.56 |
| POWER EQUIPMENT OPERATOR: (CLASS 2)- BULLDOZER; FORKLIFT(ON STEEL ERECTION AND MACHINERY MOVING OR HOISTING ABOVE ONE COMPLETE STORY); LOADER | $34.70 | $21.94 | $56.64 |
| POWER EQUIPMENT OPERATOR: (CLASS 1)- BACKHOE/EXCAVATOR/TRACKHOE | $35.02 | $21.94 | $56.96 |
| IRONWORKER: STRUCTURAL | $37.80 | $23.54 | $61.34 |
| IRONWORKER: ORNAMENTAL | $35.53 | $24.45 | $59.98 |
| IRONWORKER: REINFORCING | $37.50 | $30.99 | $68.49 |
| LABORER: MASON TENDER - BRICK | $29.36 | $17.99 | $47.35 |
| LABORER (COMMON OR GENERAL) | $29.36 | $17.99 | $47.35 |
| PAINTER: BRUSH AND ROLLER | $32.41 | $16.30 | $48.71 |
| CEMENT MASON/CONCRETE FINISHER | $34.55 | $23.83 | $58.38 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $45.20 | $23.25 | $68.45 |
| PLUMBER | $45.20 | $23.25 | $68.45 |
| ROOFER | $32.50 | $15.53 | $48.03 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $45.99 | $26.42 | $72.41 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT AND UNIT INSTALLATION) | $39.38 | $24.95 | $64.33 |
| PAINTER: SPRAY | $19.77 | $6.64 | $26.41 |
| OPERATOR: CRANE | $25.70 | $9.13 | $34.83 |
| LABORER: PIPELAYER | $16.11 | $0.00 | $16.11 |
| INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $18.17 | $4.01 | $22.18 |
| DRYWALL FINISHER/TAPER | $21.25 | $10.32 | $31.57 |
| CARPENTER, INCLUDES DRYWALL HANGING | $24.93 | $11.17 | $36.10 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $33.57 | $20.75 | $54.32 |