Building construction wages: Dubuque, Iowa
Wage determination IA20260065 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/IA20260065 on · latest revision 1 · verify at sam.gov/wage-determination/IA20260065/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $36.06 | $24.35 | $60.41 |
| BOILERMAKER | $48.48 | $33.91 | $82.39 |
| BRICKLAYER | $29.80 | $17.16 | $46.96 |
| CARPENTER (INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION) | $30.55 | $24.75 | $55.30 |
| MILLWRIGHT | $36.70 | $28.95 | $65.65 |
| ELECTRICIAN | $42.45 | $20.55 | $63.00 |
| ELEVATOR MECHANIC | $56.30 | $38.44 | $94.74 |
| POWER EQUIPMENT OPERATOR: PAVER(ALL TYPES), ROLLER | $35.29 | $18.35 | $53.64 |
| POWER EQUIPMENT OPERATOR: LOADER | $37.62 | $18.35 | $55.97 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $39.00 | $18.35 | $57.35 |
| IRONWORKER: STRUCTURAL | $35.53 | $24.45 | $59.98 |
| IRONWORKER: ORNAMENTAL | $35.53 | $24.45 | $59.98 |
| IRONWORKER: REINFORCING | $37.50 | $30.99 | $68.49 |
| LABORER (COMMON OR GENERAL) | $25.03 | $18.95 | $43.98 |
| LABORER: PIPELAYER | $25.03 | $18.95 | $43.98 |
| PAINTER: SPRAY | $29.55 | $12.10 | $41.65 |
| PAINTER (BRUSH AND ROLLER) | $29.55 | $12.10 | $41.65 |
| PLUMBER | $43.26 | $22.07 | $65.33 |
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION) | $43.26 | $22.07 | $65.33 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $45.99 | $26.42 | $72.41 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT AND UNIT INSTALLATION) | $41.45 | $23.11 | $64.56 |
| ROOFER | $21.92 | $5.07 | $26.99 |
| OPERATOR: FORKLIFT | $22.96 | $7.49 | $30.45 |
| OPERATOR: CRANE | $24.15 | $8.10 | $32.25 |
| OPERATOR: BULLDOZER | $26.13 | $13.56 | $39.69 |
| LABORER: MASON TENDER - BRICK | $19.39 | $8.17 | $27.56 |
| FLOOR LAYER: FLOOR COATING/EPOXY | $22.43 | $0.00 | $22.43 |
| CEMENT MASON/CONCRETE FINISHER | $21.66 | $2.47 | $24.13 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.