Building construction wages: Jackson + 8 more counties, Iowa
Wage determination IA20260061 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/IA20260061 on · latest revision 1 · verify at sam.gov/wage-determination/IA20260061/1
JacksonJeffersonKeokukTamaVan BurenMahaskaMonroeHenryLouisa
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $48.48 | $33.91 | $82.39 |
| CARPENTER (FORM WORK ONLY) | $34.25 | $29.53 | $63.78 |
| CARPENTER: FORM WORK ONLY (LOUISA COUNTY - NORTH OF IOWA RIVER ONLY) | $34.25 | $29.53 | $63.78 |
| ELEVATOR MECHANIC | $56.30 | $38.44 | $94.74 |
| POWER EQUIPMENT OPERATOR: CLASS 2- FORKLIFT (LOUISA COUNTY) | $41.50 | $41.25 | $82.75 |
| POWER EQUIPMENT OPERATOR: CLASS 1- CRANE (LOUISA COUNTY) | $43.50 | $41.25 | $84.75 |
| POWER EQUIPMENT OPERATOR: CRANE (JACKSON AND TAMA COUNTIES) | $40.75 | $18.35 | $59.10 |
| POWER EQUIPMENT OPERATOR: CLASS 3- FORKLIFT (OTHER THAN ABOVE) (JACKSON AND TAMA COUNTIES) | $35.29 | $18.35 | $53.64 |
| POWER EQUIPMENT OPERATOR: CLASS 2- FORKLIFT (ON STEEL ERECTION AND MACHINERY MOVING) (JACKSON AND TAMA COUNTIES) | $37.62 | $18.35 | $55.97 |
| POWER EQUIPMENT OPERATOR: CRANE (HENRY, JEFFERSON, KEOKUK, MAHASKA, MONONA AND VAN BUREN COUNTIES) | $36.93 | $21.94 | $58.87 |
| POWER EQUIPMENT OPERATOR: CLASS 2- FORKLIFT (OTHER THAN THE ABOVE) (HENRY, JEFFERSON, KEOKUK, MAHASKA, MONONA AND VAN BUREN COUNTIES) | $34.70 | $21.94 | $56.64 |
| POWER EQUIPMENT OPERATOR: CLASS 1- FORKLIFT (ON STEEL ERECTION AND MACHINERY MOVING OR HOISTING ABOVE ONE COMPLETE STORY) (HENRY, JEFFERSON, KEOKUK, MAHASKA, MONONA AND VAN BUREN COUNTIES) | $35.02 | $21.94 | $56.96 |
| IRONWORKER: REINFORCING | $37.50 | $30.99 | $68.49 |
| IRONWORKER: ORNAMENTAL | $36.30 | $25.80 | $62.10 |
| LABORER: MASON TENDER - BRICK (JACKSON COUNTY) | $25.03 | $18.95 | $43.98 |
| LABORER: MASON TENDER - BRICK (TAMA COUNTY) | $29.36 | $17.99 | $47.35 |
| LABORER: MASON TENDER - BRICK (HENRY, JEFFERSON, KEOKUK, LOUISA, MAHASKA, MONROE, AND VAN BUREN COUNTIES) | $28.57 | $17.53 | $46.10 |
| PAINTER: BRUSH AND ROLLER | $32.41 | $16.30 | $48.71 |
| DRYWALL FINISHER/TAPER | $31.82 | $19.05 | $50.87 |
| PIPEFITTER (INCLUDES HVAC PIPE AND UNIT INSTALLATION) | $46.10 | $27.05 | $73.15 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $45.99 | $26.42 | $72.41 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION) | $37.12 | $22.22 | $59.34 |
| ROOFER | $14.00 | $3.91 | $17.91 |
| PLUMBER | $31.85 | $15.12 | $46.97 |
| OPERATOR: LOADER | $25.80 | $17.19 | $42.99 |
| OPERATOR: BULLDOZER | $22.31 | $8.36 | $30.67 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $27.55 | $22.85 | $50.40 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $27.31 | $15.35 | $42.66 |
| LABORER: PIPELAYER | $18.00 | $2.70 | $20.70 |
| LABORER: LANDSCAPE | $14.81 | $0.00 | $14.81 |
| LABORER: COMMON OR GENERAL | $17.25 | $6.93 | $24.18 |
| IRONWORKER, STRUCTURAL | $25.29 | $15.89 | $41.18 |
| INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $19.04 | $7.32 | $26.36 |
| ELECTRICIAN, INCLUDES HVAC/TEMPERATURE CONTROLS INSTALLATION | $23.58 | $9.15 | $32.73 |
| CEMENT MASON/CONCRETE FINISHER | $21.12 | $11.07 | $32.19 |
| CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, AND DRYWALL HANGING (EXCLUDES FORM WORK) | $23.30 | $12.28 | $35.58 |
| BRICKLAYER | $25.93 | $9.70 | $35.63 |
| MILLWRIGHT | $35.93 | $28.05 | $63.98 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.