Building construction wages: Decatur + 9 more counties, Iowa
Wage determination IA20260060 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/IA20260060 on · latest revision 1 · verify at sam.gov/wage-determination/IA20260060/1
DecaturGreeneLucasRinggoldTaylorWayneFremontMononaMontgomeryShelby
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $48.48 | $33.91 | $82.39 |
| BRICKLAYER (FREMONT, MONTGOMERY, RINGGOLD, SHELBY, AND TAYLOR COUNTIES) | $34.80 | $19.24 | $54.04 |
| BRICKLAYER (DECATUR, GREENE, LUCAS, MONONA, AND WAYNE COUNTIES) | $29.80 | $17.16 | $46.96 |
| ELECTRICIAN (LOW VOLTAGE WIRING) | $32.97 | $15.92 | $48.89 |
| ELEVATOR MECHANIC | $56.30 | $38.44 | $94.74 |
| POWER EQUIPMENT OPERATOR: CRANE (DECATUR, FREMONT, GREENE, LUCAS, MONTGOMERY, RINGGOLD, SHELBY, TAYLOR AND WAYNE COUNTIES) | $36.93 | $21.94 | $58.87 |
| POWER EQUIPMENT OPERATOR: CLASS 2- FORKLIFT (OTHER THAN THE ABOVE) (DECATUR, FREMONT, GREENE, LUCAS, MONTGOMERY, RINGGOLD, SHELBY, TAYLOR AND WAYNE COUNTIES) | $34.70 | $21.94 | $56.64 |
| POWER EQUIPMENT OPERATOR: CLASS 1- FORKLIFT (ON STEEL ERECTION AND MACHINERY MOVING OR HOISTING ABOVE ONE COMPLETE STORY) (DECATUR, FREMONT, GREENE, LUCAS, MONTGOMERY, RINGGOLD, SHELBY, TAYLOR AND WAYNE COUNTIES) | $35.02 | $21.94 | $56.96 |
| POWER EQUIPMENT OPERATOR: CRANE (MONONA COUNTY) | $34.54 | $18.35 | $52.89 |
| POWER EQUIPMENT OPERATOR: CLASS 2- FORKLIFT (OTHER THAN THE ABOVE) (MONONA COUNTY) | $32.99 | $18.35 | $51.34 |
| POWER EQUIPMENT OPERATOR: CLASS 1- FORKLIFT (ON STEEL ERECTION AND MACHINERY MOVING) (MONONA COUNTY) | $33.54 | $18.35 | $51.89 |
| IRONWORKER: ORNAMENTAL | $36.30 | $25.80 | $62.10 |
| LABORER: MASON TENDER - BRICK (GREENE COUNTY) | $29.36 | $17.99 | $47.35 |
| LABORER: MASON TENDER - BRICK (DECATUR, LUCAS, RINGGOLD, AND WAYNE COUNTIES) | $28.57 | $17.53 | $46.10 |
| LABORER: MASON TENDER - BRICK (MONONA COUNTY) | $20.40 | $16.20 | $36.60 |
| LABORER: MASON TENDER - BRICK (FREMONT, MONTGOMERY, SHELBY, AND TAYLOR COUNTIES) | $26.90 | $12.38 | $39.28 |
| PAINTER: BRUSH AND ROLLER | $32.41 | $16.30 | $48.71 |
| CEMENT MASON/CONCRETE FINISHER | $34.55 | $23.83 | $58.38 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $45.20 | $23.25 | $68.45 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT AND UNIT INSTALLATION) | $39.38 | $24.95 | $64.33 |
| ROOFER | $15.02 | $1.88 | $16.90 |
| PLUMBER | $23.94 | $10.84 | $34.78 |
| OPERATOR: LOADER | $25.36 | $15.62 | $40.98 |
| OPERATOR: BULLDOZER | $22.31 | $8.36 | $30.67 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.14 | $18.26 | $43.40 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $24.43 | $11.20 | $35.63 |
| LABORER: PIPELAYER | $18.00 | $2.70 | $20.70 |
| LABORER: COMMON OR GENERAL | $16.32 | $4.62 | $20.94 |
| IRONWORKER, STRUCTURAL | $23.43 | $0.00 | $23.43 |
| IRONWORKER, REINFORCING | $24.43 | $16.24 | $40.67 |
| INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $18.01 | $4.19 | $22.20 |
| GLAZIER | $20.00 | $3.88 | $23.88 |
| ELECTRICIAN | $26.18 | $8.33 | $34.51 |
| CARPENTER | $21.75 | $7.54 | $29.29 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.