Building construction wages: Floyd, Iowa
Wage determination IA20260043 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/IA20260043 on · latest revision 1 · verify at sam.gov/wage-determination/IA20260043/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $48.48 | $33.91 | $82.39 |
| BRICKLAYER | $29.80 | $17.16 | $46.96 |
| ELEVATOR MECHANIC | $56.30 | $38.44 | $94.74 |
| POWER EQUIPMENT OPERATOR: (CLASS 3)- FORKLIFT (OTHER THAN ABOVE) | $35.29 | $18.35 | $53.64 |
| POWER EQUIPMENT OPERATOR: (CLASS 2)- FORKLIFT (USED FOR STEEL ERECTION OR MACHINERY MOVING) | $37.62 | $18.35 | $55.97 |
| IRONWORKER: STRUCTURAL | $35.53 | $24.45 | $59.98 |
| IRONWORKER: ORNAMENTAL | $36.30 | $25.80 | $62.10 |
| LABORER: MASON TENDER - BRICK | $29.36 | $17.99 | $47.35 |
| PAINTER: BRUSH AND ROLLER | $32.41 | $16.30 | $48.71 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $45.20 | $23.25 | $68.45 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT, AND HVAC UNIT INSTALLATION | $21.10 | $7.81 | $28.91 |
| ROOFER | $15.53 | $4.57 | $20.10 |
| PLUMBER | $25.66 | $9.61 | $35.27 |
| OPERATOR: LOADER | $25.36 | $15.62 | $40.98 |
| OPERATOR: CRANE | $21.51 | $6.41 | $27.92 |
| OPERATOR: BULLDOZER | $22.31 | $8.36 | $30.67 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.14 | $18.26 | $43.40 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $26.64 | $14.47 | $41.11 |
| LABORER: PIPELAYER | $18.00 | $2.70 | $20.70 |
| LABORER: COMMON OR GENERAL | $15.21 | $3.23 | $18.44 |
| IRONWORKER, REINFORCING | $24.43 | $16.24 | $40.67 |
| INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $18.09 | $4.67 | $22.76 |
| ELECTRICIAN | $25.02 | $9.76 | $34.78 |
| CEMENT MASON/CONCRETE FINISHER | $16.99 | $1.73 | $18.72 |
| CAULKER | $17.21 | $8.18 | $25.39 |
| CARPENTER, INCLUDES DRYWALL HANGING, AND FORM WORK | $20.94 | $10.16 | $31.10 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.