Building construction wages: Cedar, Iowa
Wage determination IA20260036 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/IA20260036 on · latest revision 1 · verify at sam.gov/wage-determination/IA20260036/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $48.48 | $33.91 | $82.39 |
| CARPENTER (FORM WORK ONLY) | $34.25 | $29.53 | $63.78 |
| ELEVATOR MECHANIC | $56.30 | $38.44 | $94.74 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $41.50 | $41.25 | $82.75 |
| POWER EQUIPMENT OPERATOR: CRANE | $43.50 | $41.25 | $84.75 |
| IRONWORKER: REINFORCING | $37.50 | $30.99 | $68.49 |
| IRONWORKER: ORNAMENTAL | $36.30 | $25.80 | $62.10 |
| LABORER: MASON TENDER - BRICK | $28.33 | $19.82 | $48.15 |
| PAINTER: BRUSH AND ROLLER | $32.41 | $16.30 | $48.71 |
| DRYWALL FINISHER/TAPER | $31.82 | $19.05 | $50.87 |
| PIPEFITTER (INCLUDES HVAC PIPE AND UNIT INSTALLATION) | $46.10 | $27.05 | $73.15 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $45.99 | $26.42 | $72.41 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $26.63 | $13.33 | $39.96 |
| ROOFER | $14.00 | $3.91 | $17.91 |
| PLUMBER | $31.85 | $15.12 | $46.97 |
| OPERATOR: LOADER | $25.80 | $17.19 | $42.99 |
| OPERATOR: BULLDOZER | $22.31 | $8.36 | $30.67 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $27.55 | $22.85 | $50.40 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $27.31 | $15.35 | $42.66 |
| LABORER: PIPELAYER | $18.00 | $2.70 | $20.70 |
| LABORER: LANDSCAPE | $14.81 | $0.00 | $14.81 |
| LABORER: COMMON OR GENERAL | $17.25 | $6.93 | $24.18 |
| IRONWORKER, STRUCTURAL | $25.29 | $15.89 | $41.18 |
| INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $19.04 | $7.32 | $26.36 |
| ELECTRICIAN, INCLUDES INSTALLATION OF HVAC/TEMPERATURE CONTROLS | $23.66 | $9.20 | $32.86 |
| CEMENT MASON/CONCRETE FINISHER | $21.12 | $11.07 | $32.19 |
| CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, AND DRYWALL HANGING (EXCLUDES FORM WORK) | $14.00 | $2.04 | $16.04 |
| BRICKLAYER | $25.93 | $9.70 | $35.63 |
| MILLWRIGHT | $35.93 | $28.05 | $63.98 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.