Building construction wages: Clarke + 3 more counties, Georgia
Wage determination GA20260321 · Active · Standard
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 2 | 2026-05-18 | diff vs rev 1 |
| rev 1 | 2026-05-17 | diff vs rev 0 |
Current rates (rev 2) · download CSV · print this page for your bid file
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $33.90 | $18.80 | $52.70 |
| ELECTRICIAN | $38.65 | $12.75 | $51.40 |
| POWER EQUIPMENT OPERATOR: (BACKHOE/ EXCAVATOR/ TRACKHOE) | $33.00 | $17.70 | $50.70 |
| OPERATOR: CRANE | $38.53 | $16.08 | $54.61 |
| OPERATOR: FORKLIFT | $32.93 | $16.08 | $49.01 |
| IRONWORKER: ORNAMENTAL | $32.00 | $15.05 | $47.05 |
| IRONWORKER, STRUCTURAL | $32.00 | $15.05 | $47.05 |
| IRONWORKER: ORNAMENTAL | $32.00 | $15.05 | $47.05 |
| IRONWORKER, STRUCTURAL | $32.00 | $15.05 | $47.05 |
| PIPEFITTER | $41.18 | $17.01 | $58.19 |
| SHEET METAL WORKER | $38.29 | $17.40 | $55.69 |
| PLUMBER | $30.68 | $10.75 | $41.43 |
| PAINTER: SPRAY | $16.29 | $0.00 | $16.29 |
| PAINTER (BRUSH AND ROLLER) | $16.14 | $0.00 | $16.14 |
| OPERATOR: ROLLER | $14.05 | $0.00 | $14.05 |
| OPERATOR: LOADER | $14.86 | $0.00 | $14.86 |
| OPERATOR: GRADER/BLADE | $16.80 | $0.00 | $16.80 |
| OPERATOR: BULLDOZER | $15.23 | $0.00 | $15.23 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $14.88 | $0.00 | $14.88 |
| LABORER: PIPELAYER | $12.55 | $1.90 | $14.45 |
| LABORER: COMMON OR GENERAL | $14.06 | $0.00 | $14.06 |
| HVAC MECHANIC (INSTALLATION OF HVAC UNIT ONLY) | $26.17 | $12.23 | $38.40 |
| HVAC MECHANIC (HVAC PIPE INSTALLATION ONLY) | $26.17 | $12.23 | $38.40 |
| CEMENT MASON/CONCRETE FINISHER | $22.92 | $0.00 | $22.92 |
| CARPENTER | $24.68 | $0.00 | $24.68 |
| IRONWORKER: REINFORCING | $31.31 | $17.68 | $48.99 |