Building construction wages: Catoosa, Dade, Walker, Georgia
Wage determination GA20260319 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/GA20260319 on July 24, 2026 · latest revision 2 · verify at sam.gov/wage-determination/GA20260319/2
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 2 | 2026-05-18 | diff vs rev 1 |
| rev 1 | 2026-05-17 | diff vs rev 0 |
Current rates (rev 2)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER | $41.18 | $17.01 | $58.19 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $30.24 | $18.54 | $48.78 |
| ELECTRICIAN | $35.35 | $14.63 | $49.98 |
| OPERATOR: CRANE | $38.53 | $16.08 | $54.61 |
| OPERATOR: FORKLIFT | $32.93 | $16.08 | $49.01 |
| IRONWORKER: ORNAMENTAL | $32.00 | $15.05 | $47.05 |
| IRONWORKER, STRUCTURAL | $32.00 | $15.05 | $47.05 |
| IRONWORKER: ORNAMENTAL | $32.00 | $15.05 | $47.05 |
| IRONWORKER, STRUCTURAL | $32.00 | $15.05 | $47.05 |
| IRONWORKER, REINFORCING | $31.00 | $18.87 | $49.87 |
| PIPEFITTER | $41.18 | $17.01 | $58.19 |
| SHEET METAL WORKER | $38.29 | $17.40 | $55.69 |
| PAINTER: SPRAY | $16.29 | $0.00 | $16.29 |
| PAINTER (BRUSH AND ROLLER) | $16.14 | $0.00 | $16.14 |
| OPERATOR: ROLLER | $14.05 | $0.00 | $14.05 |
| OPERATOR: LOADER | $14.86 | $0.00 | $14.86 |
| OPERATOR: GRADER/BLADE | $16.80 | $0.00 | $16.80 |
| OPERATOR: BULLDOZER | $15.23 | $0.00 | $15.23 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $14.88 | $0.00 | $14.88 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $19.78 | $10.28 | $30.06 |
| LABORER: PIPELAYER | $12.55 | $1.90 | $14.45 |
| LABORER: COMMON OR GENERAL | $13.72 | $5.40 | $19.12 |
| CEMENT MASON/CONCRETE FINISHER | $10.00 | $0.00 | $10.00 |
| CARPENTER | $20.69 | $4.48 | $25.17 |