Building construction wages: Dekalb, Dekalb, Georgia
Wage determination GA20260305 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/GA20260305 on July 24, 2026 · latest revision 2 · verify at sam.gov/wage-determination/GA20260305/2
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 2 | 2026-05-18 | diff vs rev 1 |
| rev 1 | 2026-05-17 | diff vs rev 0 |
Current rates (rev 2)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $33.90 | $18.80 | $52.70 |
| MILLWRIGHT | $31.58 | $17.05 | $48.63 |
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING) | $38.65 | $12.75 | $51.40 |
| ELECTRICIAN (LOW VOLTAGE WIRING) | $38.65 | $12.75 | $51.40 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $28.32 | $13.45 | $41.77 |
| OPERATOR: CRANE | $38.53 | $16.08 | $54.61 |
| OPERATOR: FORKLIFT | $32.93 | $16.08 | $49.01 |
| IRONWORKER: ORNAMENTAL | $32.00 | $15.05 | $47.05 |
| IRONWORKER, STRUCTURAL | $32.00 | $15.05 | $47.05 |
| IRONWORKER: ORNAMENTAL | $32.00 | $15.05 | $47.05 |
| IRONWORKER, STRUCTURAL | $32.00 | $15.05 | $47.05 |
| PLUMBER | $41.18 | $17.01 | $58.19 |
| PIPEFITTER (HVAC UNIT INSTALLATION ONLY) | $41.18 | $17.01 | $58.19 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $41.18 | $17.01 | $58.19 |
| PIPEFITTER (EXCLUDING HVAC PIPE AND UNIT INSTALLATION) | $41.18 | $17.01 | $58.19 |
| SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $38.29 | $17.40 | $55.69 |
| PAINTER: SPRAY | $16.29 | $0.00 | $16.29 |
| PAINTER (BRUSH AND ROLLER) | $16.14 | $0.00 | $16.14 |
| OPERATOR: ROLLER | $16.82 | $1.19 | $18.01 |
| OPERATOR: LOADER | $21.32 | $0.00 | $21.32 |
| OPERATOR: GRADER/BLADE | $16.80 | $0.00 | $16.80 |
| OPERATOR: BULLDOZER | $15.23 | $0.00 | $15.23 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $20.24 | $0.00 | $20.24 |
| LABORER: PIPELAYER | $12.55 | $1.90 | $14.45 |
| LABORER: COMMON OR GENERAL | $14.60 | $0.00 | $14.60 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $15.69 | $0.00 | $15.69 |
| INSTALLER - GUARDRAIL | $20.00 | $0.00 | $20.00 |
| GLAZIER | $21.77 | $6.36 | $28.13 |
| CEMENT MASON/CONCRETE FINISHER | $13.35 | $0.00 | $13.35 |
| CARPENTER, EXCLUDES FORM WORK | $19.00 | $0.38 | $19.38 |
| CARPENTER (FORM WORK ONLY) | $18.02 | $0.00 | $18.02 |
| IRONWORKER: REINFORCING | $31.31 | $17.68 | $48.99 |