Building construction wages: Bartow, Georgia

Wage determination GA20260302 · Active · Standard · verify on SAM.gov

Bartow

Get an email when this determination changes.This determination changed once in the last 12 months, most recently 2026-05-18: 2 rate changes, 1 added, 1 removed (ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING) $38.65 → $38.65).
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 22026-05-18diff vs rev 1
rev 12026-05-17diff vs rev 0

Current rates (rev 2)

Download CSV

The CSV and the printed sheet are snapshots of rev 2. If DOL revises this determination after you save one, the watch above tells you exactly what moved.

ClassificationRateFringeTotal
ASBESTOS WORKER/HEAT & FROST INSULATOR$33.90$18.80$52.70
MILLWRIGHT$31.58$17.05$48.63
ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING)$38.65$12.75$51.40
ELECTRICIAN (LOW VOLTAGE WIRING)$38.65$12.75$51.40
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$28.32$13.45$41.77
OPERATOR: CRANE$38.53$16.08$54.61
OPERATOR: FORKLIFT$32.93$16.08$49.01
IRONWORKER: ORNAMENTAL$32.00$15.05$47.05
IRONWORKER, STRUCTURAL$32.00$15.05$47.05
PLUMBER$41.18$17.01$58.19
PIPEFITTER (HVAC UNIT INSTALLATION ONLY)$41.18$17.01$58.19
PIPEFITTER (HVAC PIPE INSTALLATION ONLY)$41.18$17.01$58.19
PIPEFITTER (EXCLUDING HVAC PIPE AND UNIT INSTALLATION)$41.18$17.01$58.19
SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION)$38.29$17.40$55.69
PAINTER: SPRAY$16.29$0.00$16.29
PAINTER (BRUSH AND ROLLER)$16.14$0.00$16.14
OPERATOR: ROLLER$16.82$1.19$18.01
OPERATOR: LOADER$21.32$0.00$21.32
OPERATOR: GRADER/BLADE$16.80$0.00$16.80
OPERATOR: BULLDOZER$15.23$0.00$15.23
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$20.24$0.00$20.24
LABORER: PIPELAYER$12.55$1.90$14.45
LABORER: COMMON OR GENERAL$15.96$0.00$15.96
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR$15.69$0.00$15.69
INSTALLER - GUARDRAIL$20.00$0.00$20.00
GLAZIER$21.77$6.36$28.13
CEMENT MASON/CONCRETE FINISHER$10.00$0.00$10.00
CARPENTER, EXCLUDES FORM WORK$21.06$3.54$24.60
CARPENTER (FORM WORK ONLY)$18.02$0.00$18.02
IRONWORKER: REINFORCING$31.31$17.68$48.99