Heavy construction wages: Brantley, Glynn, McIntosh, Georgia
Wage determination GA20260293 · Active · Standard
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1) · download CSV · print this page for your bid file
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: ROLLER | $11.89 | $0.00 | $11.89 |
| OPERATOR: LOADER | $17.01 | $4.32 | $21.33 |
| OPERATOR: CRANE | $25.45 | $0.00 | $25.45 |
| OPERATOR: BULLDOZER | $16.29 | $0.00 | $16.29 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $22.45 | $3.35 | $25.80 |
| LABORER: PIPELAYER | $16.50 | $0.00 | $16.50 |
| LABORER: COMMON OR GENERAL | $14.09 | $2.80 | $16.89 |
| ELECTRICIAN | $23.67 | $8.02 | $31.69 |
| CEMENT MASON/CONCRETE FINISHER | $21.40 | $4.25 | $25.65 |
| CARPENTER | $24.34 | $4.53 | $28.87 |