Current rates (rev 1)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: SEMI/TRAILER TRUCK | $16.13 | $0.00 | $16.13 |
| TRUCK DRIVER: WATER TRUCK | $12.82 | $1.61 | $14.43 |
| TRUCK DRIVER: OFF THE ROAD TRUCK | $12.38 | $0.00 | $12.38 |
| TRUCK DRIVER: LOWBOY TRUCK | $16.79 | $0.00 | $16.79 |
| TRUCK DRIVER: HYDROSEEDER TRUCK | $14.92 | $0.00 | $14.92 |
| TRUCK DRIVER: FLATBED TRUCK | $14.96 | $1.19 | $16.15 |
| TRUCK DRIVER: DUMP TRUCK | $13.82 | $0.00 | $13.82 |
| TRAFFIC SIGNALIZATION: LABORER | $13.18 | $0.00 | $13.18 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $12.00 | $0.00 | $12.00 |
| TRAFFIC CONTROL: FLAGGER | $12.69 | $0.00 | $12.69 |
| PAINTER: SPRAY | $23.30 | $0.00 | $23.30 |
| OPERATOR: SCREED | $14.22 | $0.00 | $14.22 |
| OPERATOR: SCRAPER | $12.64 | $0.00 | $12.64 |
| OPERATOR: ROLLER | $12.36 | $5.11 | $17.47 |
| OPERATOR: PILEDRIVER | $16.70 | $0.00 | $16.70 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $16.12 | $0.00 | $16.12 |
| OPERATOR: MILLING MACHINE | $12.50 | $0.00 | $12.50 |
| OPERATOR: MECHANIC | $18.21 | $0.00 | $18.21 |
| OPERATOR: LOADER | $12.83 | $0.00 | $12.83 |
| OPERATOR: HYDROSEEDER | $11.68 | $0.00 | $11.68 |
| OPERATOR: GRADER/BLADE | $15.94 | $0.00 | $15.94 |
| OPERATOR: CRANE | $20.75 | $3.13 | $23.88 |
| OPERATOR: COMPACTOR | $12.60 | $2.17 | $14.77 |
| OPERATOR: BULLDOZER | $14.60 | $0.00 | $14.60 |
| OPERATOR: BROOM/SWEEPER | $11.58 | $0.00 | $11.58 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $12.22 | $0.00 | $12.22 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $14.90 | $2.69 | $17.59 |
| LABORER: COMMON OR GENERAL, INCLUDES EROSION CONTROL | $11.05 | $2.27 | $13.32 |
| LABORER: ASPHALT (INCLUDES DISTRIBUTOR, RAKER, SCREED, SHOVELER, AND SPREADER) | $11.92 | $0.00 | $11.92 |
| LABORER: PIPELAYER | $13.04 | $0.00 | $13.04 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $11.82 | $0.00 | $11.82 |
| LABORER: GRADE CHECKER | $11.45 | $0.00 | $11.45 |
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) | $18.47 | $0.00 | $18.47 |
| IRONWORKER, STRUCTURAL | $15.14 | $0.00 | $15.14 |
| IRONWORKER, REINFORCING | $18.46 | $0.00 | $18.46 |
| INSTALLER - GUARDRAIL | $12.85 | $0.00 | $12.85 |
| HIGHWAY/PARKING LOT STRIPING: OPERATOR (STRIPING MACHINE) | $13.12 | $0.00 | $13.12 |
| FORM WORKER | $12.09 | $0.00 | $12.09 |
| CEMENT MASON/CONCRETE FINISHER | $15.37 | $0.00 | $15.37 |
| CARPENTER, EXCLUDES FORM WORK | $15.30 | $0.00 | $15.30 |