Highway construction wages: Banks + 10 more counties, Georgia
Wage determination GA20260213 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/GA20260213 on · latest revision 1 · verify at sam.gov/wage-determination/GA20260213/1
BanksChattoogaFanninGilmerLumpkinPolkRabunTownsUnionWhiteElbert
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: SEMI/TRAILER TRUCK | $16.99 | $0.00 | $16.99 |
| TRUCK DRIVER: WATER TRUCK | $12.82 | $0.00 | $12.82 |
| TRUCK DRIVER: LOWBOY TRUCK | $17.42 | $0.00 | $17.42 |
| TRUCK DRIVER: HYDROSEEDER TRUCK | $11.23 | $0.00 | $11.23 |
| TRUCK DRIVER: FLATBED TRUCK | $15.42 | $2.02 | $17.44 |
| TRUCK DRIVER: DUMP TRUCK | $14.35 | $0.00 | $14.35 |
| TRAFFIC SIGNALIZATION: LABORER | $13.38 | $0.83 | $14.21 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $13.20 | $0.00 | $13.20 |
| TRAFFIC CONTROL: FLAGGER | $12.62 | $0.00 | $12.62 |
| OPERATOR: SHUTTLE BUGGY | $13.61 | $0.00 | $13.61 |
| OPERATOR: SCREED | $15.23 | $1.70 | $16.93 |
| OPERATOR: SCRAPER | $13.16 | $0.00 | $13.16 |
| OPERATOR: ROLLER | $14.01 | $2.71 | $16.72 |
| OPERATOR: PILEDRIVER | $20.34 | $2.86 | $23.20 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $16.54 | $3.26 | $19.80 |
| OPERATOR: MILLING MACHINE GROUNDSMAN | $14.50 | $2.18 | $16.68 |
| OPERATOR: MILLING MACHINE | $15.95 | $0.00 | $15.95 |
| OPERATOR: MECHANIC | $16.88 | $0.00 | $16.88 |
| OPERATOR: LOADER | $14.16 | $0.00 | $14.16 |
| OPERATOR: HYDROSEEDER | $15.82 | $0.00 | $15.82 |
| OPERATOR: GRADER/BLADE | $19.05 | $0.00 | $19.05 |
| OPERATOR: DISTRIBUTOR | $17.24 | $3.99 | $21.23 |
| OPERATOR: CRANE | $21.35 | $4.08 | $25.43 |
| OPERATOR: CONCRETE SAW | $18.10 | $1.95 | $20.05 |
| OPERATOR: COMPACTOR | $13.31 | $2.19 | $15.50 |
| OPERATOR: BULLDOZER | $14.96 | $1.85 | $16.81 |
| OPERATOR: BROOM/SWEEPER | $13.71 | $0.00 | $13.71 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.27 | $0.00 | $16.27 |
| LABORER: COMMON OR GENERAL, INCLUDES EROSION CONTROL | $11.35 | $0.00 | $11.35 |
| LABORER: ASPHALT (INCLUDES DISTRIBUTOR, RAKER, SCREED, SHOVELER, AND SPREADER) | $13.34 | $0.00 | $13.34 |
| LABORER: PIPELAYER | $14.50 | $0.00 | $14.50 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $10.45 | $0.00 | $10.45 |
| LABORER: GRADE CHECKER | $13.12 | $0.00 | $13.12 |
| IRONWORKER: REINFORCING | $14.63 | $0.00 | $14.63 |
| IRONWORKER, STRUCTURAL | $15.53 | $0.00 | $15.53 |
| INSTALLER: GUARDRAIL | $14.27 | $0.00 | $14.27 |
| HIGHWAY/PARKING LOT STRIPING: OPERATOR (STRIPING MACHINE) | $12.17 | $1.82 | $13.99 |
| FORM WORKER | $14.18 | $1.82 | $16.00 |
| CEMENT MASON/CONCRETE FINISHER | $14.58 | $1.57 | $16.15 |
| CARPENTER, EXCLUDES FORM WORK | $14.64 | $1.98 | $16.62 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.