Building construction wages: Turner, Ware, Wayne, Georgia
Wage determination GA20260108 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/GA20260108 on July 24, 2026 · latest revision 2 · verify at sam.gov/wage-determination/GA20260108/2
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 2 | 2026-05-18 | diff vs rev 1 |
| rev 1 | 2026-05-17 | diff vs rev 0 |
Current rates (rev 2)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $34.21 | $23.92 | $58.13 |
| ELECTRICIAN: INCLUDING ALARM INSTALLATION AND LOW VOLTAGE WIRING (WARE & WAYNE COUNTIES) | $33.35 | $13.40 | $46.75 |
| ELECTRICIAN: INCLUDING ALARM INSTALLATION AND LOW VOLTAGE WIRING (TURNER COUNTY) | $29.50 | $14.88 | $44.38 |
| POWER EQUIPMENT OPERATOR: CRANE (OVER 250 TONS) | $34.00 | $17.70 | $51.70 |
| POWER EQUIPMENT OPERATOR: CRANE (OVER 120 TONS) | $33.00 | $17.70 | $50.70 |
| POWER EQUIPMENT OPERATOR: CRANE (OVER 10 TONS) | $32.00 | $17.70 | $49.70 |
| PIPEFITTER: INCLUDING HVAC UNIT AND HVAC ELECTRICAL TEMPERATURE CONTROL INSTALLATION; EXCLUDING HVAC PIPE INSTALLATION (TURNER COUNTY) | $38.98 | $17.01 | $55.99 |
| PIPEFITTER: INCLUDING HVAC UNIT AND HVAC ELECTRICAL TEMPERATURE CONTROL INSTALLATION; EXCLUDING HVAC PIPE INSTALLATION (WARE & WAYNE COUNTIES) | $34.00 | $16.35 | $50.35 |
| SHEET METAL WORKER: EXCLUDES HVAC DUCT INSTALLATION (TURNER COUNTY) | $37.75 | $17.95 | $55.70 |
| SHEET METAL WORKER: EXCLUDES HVAC DUCT INSTALLATION (WARE & WAYNE COUNTIES) | $37.75 | $17.95 | $55.70 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $19.25 | $2.54 | $21.79 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $15.09 | $3.53 | $18.62 |
| ROOFER | $13.62 | $0.00 | $13.62 |
| PLUMBER, EXCLUDES INSTALLATION OF HVAC PIPE, HVAC UNIT, AND HVAC ELECTRICAL/TEMPERATURE CONTROLS | $18.55 | $3.35 | $21.90 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $16.38 | $4.56 | $20.94 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $16.00 | $1.62 | $17.62 |
| OPERATOR: OILER | $12.00 | $0.00 | $12.00 |
| OPERATOR: BACKHOE/EXCAVATOR | $15.00 | $0.75 | $15.75 |
| LABORER: PIPELAYER | $13.33 | $0.00 | $13.33 |
| LABORER: COMMON OR GENERAL | $9.55 | $0.00 | $9.55 |
| IRONWORKER, STRUCTURAL | $16.75 | $0.00 | $16.75 |
| IRONWORKER, REINFORCING | $17.72 | $0.00 | $17.72 |
| GLAZIER | $13.19 | $0.00 | $13.19 |
| ELEVATOR MECHANIC | $19.38 | $14.42 | $33.80 |
| CEMENT MASON/CONCRETE FINISHER | $11.75 | $0.00 | $11.75 |
| CARPENTER, INCLUDES FORM WORK | $15.97 | $1.95 | $17.92 |