Building construction wages: Emanuel + 17 more counties, Georgia
Wage determination GA20260105 · Active · Standard
EmanuelGlascockJenkinsTaliaferroWarrenWilkesHancockJohnsonMontgomeryTreutlenWashingtonWheelerBullochCandlerEvansScrevenTattnallToombs
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1) · download CSV · print this page for your bid file
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $34.21 | $23.92 | $58.13 |
| ELECTRICIAN (BULLOCH, CANDLER, EMANUEL, EVANS, SCREVEN, TATTNALL, & TOOMBS) | $33.35 | $13.40 | $46.75 |
| ELECTRICIAN (HANCOCK, JOHNSON, MONTGOMERY, TREUTLEN, WASHINGTON, & WHEELER COUNTIES) | $32.00 | $14.71 | $46.71 |
| ELECTRICIAN (GLASCOCK, JENKINS, TALIAFERRO, WARREN, & WILKES COUNTIES) | $32.25 | $16.95 | $49.20 |
| POWER EQUIPMENT OPERATOR: CRANE (OVER 250 TONS) (BULLOCH, CANDLER, EMANUEL, EVANS, JENKINS, JOHNSON, MONTGOMERY, SCREVEN, TATTNALL, TOOMBS, TREUTLEN, WASHINGTON, & WHEELER COUNTIES) | $34.00 | $17.70 | $51.70 |
| POWER EQUIPMENT OPERATOR: CRANE (OVER 120 TONS) (BULLOCH, CANDLER, EMANUEL, EVANS, JENKINS, JOHNSON, MONTGOMERY, SCREVEN, TATTNALL, TOOMBS, TREUTLEN, WASHINGTON, & WHEELER COUNTIES) | $33.00 | $17.70 | $50.70 |
| POWER EQUIPMENT OPERATOR: CRANE (OVER 10 TONS) (BULLOCH, CANDLER, EMANUEL, EVANS, JENKINS, JOHNSON, MONTGOMERY, SCREVEN, TATTNALL, TOOMBS, TREUTLEN, WASHINGTON, & WHEELER COUNTIES) | $32.00 | $17.70 | $49.70 |
| POWER EQUIPMENT OPERATOR: CRANE (GLASCOCK, HANCOCK, TALIAFERRO, WARREN, & WILKES COUNTIES) | $38.53 | $16.08 | $54.61 |
| PLUMBER | $41.18 | $17.01 | $58.19 |
| PIPEFITTER | $35.45 | $17.55 | $53.00 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $15.77 | $0.00 | $15.77 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $19.33 | $5.47 | $24.80 |
| ROOFER | $13.62 | $0.00 | $13.62 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $14.77 | $0.27 | $15.04 |
| OPERATOR: OILER | $12.00 | $0.00 | $12.00 |
| OPERATOR: BACKHOE/EXCAVATOR | $14.00 | $0.00 | $14.00 |
| LABORER: PIPELAYER | $15.50 | $0.00 | $15.50 |
| LABORER: COMMON OR GENERAL | $11.69 | $0.46 | $12.15 |
| IRONWORKER, STRUCTURAL | $16.75 | $0.00 | $16.75 |
| IRONWORKER, REINFORCING | $17.72 | $0.00 | $17.72 |
| ELEVATOR MECHANIC | $19.38 | $7.53 | $26.91 |
| CEMENT MASON/CONCRETE FINISHER | $12.89 | $0.00 | $12.89 |
| CARPENTER | $18.91 | $3.37 | $22.28 |