Building construction wages: Emanuel + 17 more counties, Georgia
Wage determination GA20260105 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/GA20260105 on · latest revision 1 · verify at sam.gov/wage-determination/GA20260105/1
EmanuelGlascockJenkinsTaliaferroWarrenWilkesHancockJohnsonMontgomeryTreutlenWashingtonWheelerBullochCandlerEvansScrevenTattnallToombs
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $34.21 | $23.92 | $58.13 |
| ELECTRICIAN (BULLOCH, CANDLER, EMANUEL, EVANS, SCREVEN, TATTNALL, & TOOMBS) | $33.35 | $13.40 | $46.75 |
| ELECTRICIAN (HANCOCK, JOHNSON, MONTGOMERY, TREUTLEN, WASHINGTON, & WHEELER COUNTIES) | $32.00 | $14.71 | $46.71 |
| ELECTRICIAN (GLASCOCK, JENKINS, TALIAFERRO, WARREN, & WILKES COUNTIES) | $32.25 | $16.95 | $49.20 |
| POWER EQUIPMENT OPERATOR: CRANE (OVER 250 TONS) (BULLOCH, CANDLER, EMANUEL, EVANS, JENKINS, JOHNSON, MONTGOMERY, SCREVEN, TATTNALL, TOOMBS, TREUTLEN, WASHINGTON, & WHEELER COUNTIES) | $34.00 | $17.70 | $51.70 |
| POWER EQUIPMENT OPERATOR: CRANE (OVER 120 TONS) (BULLOCH, CANDLER, EMANUEL, EVANS, JENKINS, JOHNSON, MONTGOMERY, SCREVEN, TATTNALL, TOOMBS, TREUTLEN, WASHINGTON, & WHEELER COUNTIES) | $33.00 | $17.70 | $50.70 |
| POWER EQUIPMENT OPERATOR: CRANE (OVER 10 TONS) (BULLOCH, CANDLER, EMANUEL, EVANS, JENKINS, JOHNSON, MONTGOMERY, SCREVEN, TATTNALL, TOOMBS, TREUTLEN, WASHINGTON, & WHEELER COUNTIES) | $32.00 | $17.70 | $49.70 |
| POWER EQUIPMENT OPERATOR: CRANE (GLASCOCK, HANCOCK, TALIAFERRO, WARREN, & WILKES COUNTIES) | $38.53 | $16.08 | $54.61 |
| PLUMBER | $41.18 | $17.01 | $58.19 |
| PIPEFITTER | $35.45 | $17.55 | $53.00 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $15.77 | $0.00 | $15.77 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $19.33 | $5.47 | $24.80 |
| ROOFER | $13.62 | $0.00 | $13.62 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $14.77 | $0.27 | $15.04 |
| OPERATOR: OILER | $12.00 | $0.00 | $12.00 |
| OPERATOR: BACKHOE/EXCAVATOR | $14.00 | $0.00 | $14.00 |
| LABORER: PIPELAYER | $15.50 | $0.00 | $15.50 |
| LABORER: COMMON OR GENERAL | $11.69 | $0.46 | $12.15 |
| IRONWORKER, STRUCTURAL | $16.75 | $0.00 | $16.75 |
| IRONWORKER, REINFORCING | $17.72 | $0.00 | $17.72 |
| ELEVATOR MECHANIC | $19.38 | $7.53 | $26.91 |
| CEMENT MASON/CONCRETE FINISHER | $12.89 | $0.00 | $12.89 |
| CARPENTER | $18.91 | $3.37 | $22.28 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.