Building construction wages: Charlton, Georgia
Wage determination GA20260088 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/GA20260088 on · latest revision 2 · verify at sam.gov/wage-determination/GA20260088/2
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 2 | 2026-05-18 | diff vs rev 1 |
| rev 1 | 2026-05-17 | diff vs rev 0 |
Current rates (rev 2)
The CSV and the printed sheet are snapshots of rev 2. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $34.21 | $23.92 | $58.13 |
| ELECTRICIAN (Includes Low Voltage Wiring) PAID HOLIDAYS: New Year's Day, MLK, Memorial Day, 4th of July, Labor Day, Thanksgiving Day, The Day after Thanksgiving and Christmas Day | $35.60 | $14.97 | $50.57 |
| POWER EQUIPMENT OPERATOR: CRANE (OVER 250 TONS) | $34.00 | $17.70 | $51.70 |
| POWER EQUIPMENT OPERATOR: CRANE (OVER 120 TONS) | $33.00 | $17.70 | $50.70 |
| POWER EQUIPMENT OPERATOR: CRANE (OVER 10 TONS) | $32.00 | $17.70 | $49.70 |
| PIPEFITTER (INCLUDING HVAC UNIT AND HVAC ELECTRICAL TEMPERATURE CONTROL INSTALLATION; EXCLUDING HVAC PIPE INSTALLATION) | $34.00 | $16.35 | $50.35 |
| SHEET METAL WORKER (EXCLUDES HVAC DUCT INSTALLATION) | $37.75 | $17.95 | $55.70 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $19.25 | $2.54 | $21.79 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $15.09 | $3.53 | $18.62 |
| ROOFER | $13.62 | $0.00 | $13.62 |
| PLUMBER, EXCLUDES INSTALLATION OF HVAC PIPE, HVAC UNIT, AND HVAC ELECTRICAL/TEMPERATURE CONTROLS | $18.55 | $3.35 | $21.90 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $16.38 | $4.56 | $20.94 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $16.00 | $1.62 | $17.62 |
| OPERATOR: OILER | $12.00 | $0.00 | $12.00 |
| OPERATOR: BACKHOE/EXCAVATOR | $15.00 | $0.75 | $15.75 |
| LABORER: PIPELAYER | $13.33 | $0.00 | $13.33 |
| LABORER: COMMON OR GENERAL | $9.00 | $0.00 | $9.00 |
| IRONWORKER, STRUCTURAL | $16.75 | $0.00 | $16.75 |
| IRONWORKER, REINFORCING | $17.72 | $0.00 | $17.72 |
| GLAZIER | $13.19 | $0.00 | $13.19 |
| ELEVATOR MECHANIC | $19.38 | $14.42 | $33.80 |
| CEMENT MASON/CONCRETE FINISHER | $11.75 | $0.00 | $11.75 |
| CARPENTER, INCLUDES FORM WORK | $15.97 | $1.95 | $17.92 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.