Building construction wages: Bleckley, Georgia
Wage determination GA20260086 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/GA20260086 on · latest revision 2 · verify at sam.gov/wage-determination/GA20260086/2
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 2 | 2026-05-18 | diff vs rev 1 |
| rev 1 | 2026-05-17 | diff vs rev 0 |
Current rates (rev 2)
The CSV and the printed sheet are snapshots of rev 2. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $34.21 | $23.92 | $58.13 |
| ELECTRICIAN (INCLUDING LOW VOLTAGE WIRING) | $32.00 | $14.71 | $46.71 |
| ELEVATOR MECHANIC PAID HOLIDAYS: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE | $52.08 | $38.44 | $90.52 |
| POWER EQUIPMENT OPERATOR: CRANE (OVER 250 TONS) | $34.00 | $17.70 | $51.70 |
| POWER EQUIPMENT OPERATOR: CRANE (OVER 120 TONS) | $33.00 | $17.70 | $50.70 |
| POWER EQUIPMENT OPERATOR: CRANE (OVER 10 TONS) | $32.00 | $17.70 | $49.70 |
| PAINTER: BRUSH, ROLLER, SPRAY | $26.00 | $14.90 | $40.90 |
| PIPEFITTER (INCLUDING HVAC PIPE AND HVAC UNIT INSTALLATION) | $41.18 | $17.01 | $58.19 |
| PLUMBER | $38.98 | $17.01 | $55.99 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $37.75 | $17.95 | $55.70 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $18.81 | $1.44 | $20.25 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $18.91 | $0.00 | $18.91 |
| ROOFER | $13.62 | $0.00 | $13.62 |
| OPERATOR: OILER | $12.00 | $0.00 | $12.00 |
| OPERATOR: BACKHOE/EXCAVATOR | $15.50 | $0.65 | $16.15 |
| LABORER: PIPELAYER | $13.33 | $0.00 | $13.33 |
| LABORER: COMMON OR GENERAL | $10.51 | $0.59 | $11.10 |
| IRONWORKER, STRUCTURAL | $16.75 | $0.00 | $16.75 |
| IRONWORKER, REINFORCING | $17.72 | $0.00 | $17.72 |
| GLAZIER | $14.93 | $1.11 | $16.04 |
| DRYWALL HANGER, INCLUDES METAL STUD INSTALLATION | $12.00 | $0.00 | $12.00 |
| CEMENT MASON/CONCRETE FINISHER | $12.45 | $0.54 | $12.99 |
| CARPENTER, EXCLUDES DRYWALL HANGING, AND METAL STUD INSTALLATION | $18.00 | $0.00 | $18.00 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.