Residential construction wages: Lamar, Georgia
Wage determination GA20260042 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/GA20260042 on · latest revision 1 · verify at sam.gov/wage-determination/GA20260042/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| OPERATING ENGINEERS: BACKHOE, COMPACTOR, AND LOADER | $28.32 | $13.45 | $41.77 |
| OPERATING ENGINEER: BULLDOZER | $28.32 | $13.45 | $41.77 |
| SHEET METAL WORKER (BUILDINGS UP TO 100,000 SQUARE FEET) | $32.60 | $15.52 | $48.12 |
| SHEET METAL WORKER (BUILIDNGS OVER 100,000 SQUARE FEET) | $32.60 | $13.41 | $46.01 |
| TRUCK DRIVER | $12.13 | $0.00 | $12.13 |
| TILE SETTER | $11.07 | $0.00 | $11.07 |
| ROOFER | $11.50 | $0.00 | $11.50 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | $10.95 | $0.00 | $10.95 |
| PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING | $10.57 | $0.00 | $10.57 |
| OPERATOR: EXCAVATOR | $8.96 | $0.00 | $8.96 |
| LABORER: MASON TENDER | $8.00 | $0.00 | $8.00 |
| LABORER: COMMON OR GENERAL | $7.25 | $0.00 | $7.25 |
| HVAC MECHANIC (HVAC PIPE INSTALLATION) | $11.14 | $0.00 | $11.14 |
| FORM WORKER | $8.50 | $0.16 | $8.66 |
| ELECTRICIAN, INCLUDES INSTALLATION OF ALARMS | $11.57 | $0.00 | $11.57 |
| DRYWALL HANGER | $11.42 | $0.00 | $11.42 |
| DRYWALL FINISHER/TAPER | $13.45 | $0.00 | $13.45 |
| CEMENT MASON/CONCRETE FINISHER | $13.02 | $3.52 | $16.54 |
| CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK | $12.00 | $0.00 | $12.00 |
| BRICKLAYER | $13.83 | $0.00 | $13.83 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.