Residential construction wages: Stephens, Georgia
Wage determination GA20260012 · Active · Standard
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1) · download CSV · print this page for your bid file
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $9.73 | $0.00 | $9.73 |
| PLUMBER | $15.00 | $0.00 | $15.00 |
| PAINTER: BRUSH ONLY | $10.45 | $0.00 | $10.45 |
| OPERATOR: BACKHOE/EXCAVATOR | $11.89 | $0.00 | $11.89 |
| LABORER: COMMON OR GENERAL | $9.00 | $0.00 | $9.00 |
| HVAC MECHANIC (INSTALLATION OF HVAC DUCT) | $10.51 | $0.00 | $10.51 |
| CEMENT MASON/CONCRETE FINISHER | $8.00 | $0.00 | $8.00 |
| CARPENTER | $12.60 | $0.00 | $12.60 |
| ELECTRICIAN | $11.42 | $0.00 | $11.42 |