Highway construction wages: Fulton, Georgia
Wage determination GA20260001 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/GA20260001 on · latest revision 1 · verify at sam.gov/wage-determination/GA20260001/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: LOWBOY TRUCK | $26.18 | $3.73 | $29.91 |
| TRUCK DRIVER: DUMP TRUCK | $22.21 | $3.58 | $25.79 |
| TRAFFIC CONTROL: FLAGGER | $14.80 | $2.76 | $17.56 |
| OPERATOR: SCREED | $21.00 | $4.22 | $25.22 |
| OPERATOR: ROLLER | $19.93 | $3.14 | $23.07 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $25.58 | $4.21 | $29.79 |
| OPERATOR: MILLING MACHINE | $29.67 | $6.29 | $35.96 |
| OPERATOR: LOADER | $22.37 | $1.40 | $23.77 |
| OPERATOR: GRADER/BLADE | $27.95 | $4.42 | $32.37 |
| OPERATOR: CRANE | $39.31 | $0.00 | $39.31 |
| OPERATOR: BULLDOZER | $24.68 | $2.59 | $27.27 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $25.54 | $4.50 | $30.04 |
| LABORER: PIPELAYER | $22.42 | $0.00 | $22.42 |
| LABORER: COMMON OR GENERAL | $20.99 | $0.00 | $20.99 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $17.23 | $2.23 | $19.46 |
| CEMENT MASON/CONCRETE FINISHER | $30.37 | $0.00 | $30.37 |
| CARPENTER | $32.68 | $0.00 | $32.68 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.