Residential construction wages: Litchfield, Windham, Connecticut
Wage determination CT20260004 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/CT20260004 on · latest revision 1 · verify at sam.gov/wage-determination/CT20260004/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: FRONT END LOADERS (3 CY UP TO 7 CY) | $50.22 | $29.80 | $80.02 |
| TRUCK DRIVER (3 AXLE) | $13.69 | $2.05 | $15.74 |
| POWER EQUIPMENT OPERATORS: BULLDOZERS | $13.40 | $1.29 | $14.69 |
| POWER EQUIPMENT OPERATORS: BACKHOES | $16.87 | $2.45 | $19.32 |
| PLUMBER (EXCLUDING HVAC WORK) | $14.25 | $2.31 | $16.56 |
| PAINTER (EXCLUDING DRYWALL FINISHING) | $8.96 | $0.00 | $8.96 |
| LABORERS: UNSKILLED | $13.17 | $2.89 | $16.06 |
| LABORERS: LANDSCAPE WORKERS | $8.00 | $0.49 | $8.49 |
| INSULATOR - BATT | $8.40 | $2.60 | $11.00 |
| HVAC MECHANIC | $11.00 | $1.49 | $12.49 |
| CEMENT MASON/CONCRETE FINISHER | $10.50 | $0.48 | $10.98 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.