CO20260013: rev 0 → rev 1
2 rate changes, 6 added, 4 removed.
Rate changes
Rates below include fringe (the full hourly package). Enter your remaining crew hours per classification to price this change for a job.
| Classification | Old total | New total | Δ/hr | Hours on job | Cost impact |
|---|---|---|---|---|---|
| TRAFFIC SIGNALIZATION: TRAFFIC SIGNAL INSTALLATION ZONE 1 (SUMMIT COUNTY) TRAFFIC SIGNAL INSTALLER ZONE DEFINITIONS ZONE 1 SHALL BE A 35 MILE RADIUS, MEASURED FROM THE FOLLOWING ADDRESSES IN EACH OF THE FOLLOWING CITIES: COLORADO SPRINGS - NEVADA & BIJOU DENVER - ELLSWORTH AVENUE & BROADWAY FT. COLLINS - PROSPECT & COLLEGE GRAND JUNCTION - 12TH & NORTH AVENUE PUEBLO - I-25 & HIGHWAY 50 ALL WORK OUTSIDE OF THESE AREAS SHALL BE PAID ZONE 2 RATES | $35.10 | $36.35 | +1.25 | — | |
| TRAFFIC SIGNALIZATION: TRAFFIC SIGNAL INSTALLATION ZONE 2 (SUMMIT COUNTY) TRAFFIC SIGNAL INSTALLER ZONE DEFINITIONS ZONE 1 SHALL BE A 35 MILE RADIUS, MEASURED FROM THE FOLLOWING ADDRESSES IN EACH OF THE FOLLOWING CITIES: COLORADO SPRINGS - NEVADA & BIJOU DENVER - ELLSWORTH AVENUE & BROADWAY FT. COLLINS - PROSPECT & COLLEGE GRAND JUNCTION - 12TH & NORTH AVENUE PUEBLO - I-25 & HIGHWAY 50 ALL WORK OUTSIDE OF THESE AREAS SHALL BE PAID ZONE 2 RATES | $38.10 | $39.50 | +1.40 | — |
Added classifications
| POWER EQUIPMENT OPERATOR: ROLLER/COMPACTOR (DIRT AND GRADE COMPACTION) (RIO BLANCO) | $23.67 | $9.22 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (RIO BLANCO) | $23.67 | $9.22 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (GRAND, PITKIN) | $22.67 | $8.72 |
| POWER EQUIPMENT OPERATOR: BROOM/SWEEPER (SUMMIT) | $22.67 | $8.72 |
| POWER EQUIPMENT OPERATOR: ASPHALT ROLLER (GRAND) | $22.67 | $8.72 |
| POWER EQUIPMENT OPERATOR: ASPHALT LAYDOWN (RIO BLANCO) | $23.67 | $9.22 |
Removed classifications
| POWER EQUIPMENT OPERATOR - Rio Blanco | was $23.67 |
| POWER EQUIPMENT OPERATOR - Grand | was $22.67 |
| POWER EQUIPMENT OPERATOR - Summit | was $22.67 |
| POWER EQUIPMENT OPERATOR - Grand, Pitkin | was $22.67 |