1 rate change(s), 4 added, 4 removed.
Rate changes
Rates below include fringe (the full hourly package). Enter your remaining crew hours per classification to price this change for a job.
Added classifications
| POWER EQUIPMENT OPERATOR: SCREED (ARAPAHOE) | $22.67 | $8.72 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (PARK) | $22.67 | $8.72 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE (ARAPAHOE) | $22.67 | $8.72 |
| POWER EQUIPMENT OPERATOR: ASPHALT LAYDOWN (PARK) | $22.67 | $8.72 |
Removed classifications
| POWER EQUIPMENT OPERATOR - Park | was $22.67 |
| POWER EQUIPMENT OPERATOR - Arapahoe | was $22.67 |
| POWER EQUIPMENT OPERATOR - Park | was $22.67 |
| POWER EQUIPMENT OPERATOR - Arapahoe | was $22.67 |