CA20260018: rev 4 → rev 5
14 rate changes, 17 added, 38 removed.
Rate changes
Rates below include fringe (the full hourly package). Enter your remaining crew hours per classification to price this change for a job.
| Classification | Old total | New total | Δ/hr | Hours on job | Cost impact |
|---|---|---|---|---|---|
| SOUND & COMMUNICATIONS: INSTALLER SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS | $88.58 | $90.34 | +1.76 | — | |
| SOUND & COMMUNICATIONS: TECHNICIAN (SAN FRANCISCO COUNTY) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS | $97.40 | $99.43 | +2.03 | — | |
| ELECTRICIAN (SAN FRANCISCO COUNTY) | $136.56 | $139.30 | +2.74 | — | |
| SOUND & COMMUNICATIONS: INSTALLER (CONTRA COSTA COUNTY) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS | $82.33 | $83.92 | +1.59 | — | |
| SOUND & COMMUNICATIONS: TECHNICIAN (CONTRA COSTA COUNTY) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS | $90.29 | $92.12 | +1.83 | — | |
| CABLE SPLICER (ALAMEDA COUNTY) | $134.19 | $136.81 | +2.62 | — | |
| ELECTRICIAN (ALAMEDA COUNTY) | $122.79 | $125.07 | +2.28 | — | |
| CABLE SPLICER (CALAVERAS AND SAN JOAQUIN COUNTIES) | $89.82 | $91.60 | +1.78 | — | |
| ELECTRICIAN: (1) TUNNEL WORK (CALAVERAS AND SAN JOAQUIN COUNTIES) | $82.40 | $83.96 | +1.56 | — | |
| ELECTRICIAN: (2) ALL OTHER WORK (CALAVERAS AND SAN JOAQUIN COUNTIES) | $79.93 | $81.41 | +1.48 | — | |
| SOUND & COMMUNICATIONS: INSTALLER (ALAMEDA COUNTY) | $87.58 | $89.33 | +1.75 | — | |
| SOUND & COMMUNICATIONS, TECHNICIAN (ALAMEDA COUNTY) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS | $96.33 | $98.34 | +2.01 | — | |
| COMMUNICATIONS SYSTEM: INSTALLER (CALAVERAS AND SAN JOAQUIN COUNTIES) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS | $71.93 | $73.29 | +1.36 | — | |
| COMMUNICATIONS SYSTEM: TECHNICIAN (CALAVERAS AND SAN JOAQUIN COUNTIES) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS | $78.72 | $80.28 | +1.56 | — |
Added classifications
| LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS (CALAVERAS AND SAN JOAQUIN COUNTIES)- (2) Establishment Warranty Period | $31.59 | $29.89 |
| LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS (CALAVERAS AND SAN JOAQUIN COUNTIES)- (1) New Construction | $37.90 | $29.89 |
| LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A: (SAN FRANCISCO, AND SAN MATEO COUNTIES)- (2) Establishment Warranty Period | $29.94 | $27.30 |
| LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A: (SAN FRANCISCO, AND SAN MATEO COUNTIES)- (1) New Construction | $36.25 | $27.30 |
| LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B (MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES)- (2) Establishment Warranty Period | $28.94 | $27.30 |
| LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B (MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES)- (1) New Construction | $35.25 | $27.30 |
| LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B: (FRESNO, KINGS, AND MADERA COUNTIES)- (2) Establishment Warranty Period | $28.94 | $27.30 |
| LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B: (FRESNO, KINGS, AND MADERA COUNTIES)- (1) New Construction | $35.25 | $27.30 |
| LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A: (SANTA CLARA COUNTY)- (2) Establishment Warranty Period | $29.94 | $27.30 |
| LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A: (SANTA CLARA COUNTY)- (1) New Construction | $36.25 | $27.30 |
| LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A: (ALAMEDA COUNTY)- (2) Establishment Warranty Period | $29.94 | $27.30 |
| LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A: (ALAMEDA COUNTY)- (1) New Construction | $36.25 | $27.30 |
| LABORER: GARDENERS, HORTICULURAL & LANDSCAPE LABORERS - AREA A: (CONTRA COSTA COUNTY)- (2) Establishment Warranty Period | $29.94 | $27.30 |
| LABORER: GARDENERS, HORTICULURAL & LANDSCAPE LABORERS - AREA A: (CONTRA COSTA COUNTY)- (1) New Construction | $36.25 | $27.30 |
| LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B: (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE , COUNTIES)- (2) Establishment Warranty Period | $28.94 | $27.30 |
| LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B: (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE , COUNTIES)- (1) New Construction | $35.25 | $27.30 |
| PLUMBER, PIPEFITTER, STEAMFITTER (ALAMEDA & CONTRA COSTA COUNTIES) | $80.50 | $50.45 |
Removed classifications
| Asbestos Removal worker/hazardous material handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not) - Area 1 | was $34.56 |
| LINE CONSTRUCTION - (4) Powderman | was $51.87 |
| OPERATOR: Power Equipment (Cranes and Attachments - AREA 1) - Oiler | was $43.79 |
| OPERATOR: Power Equipment (Cranes and Attachments - AREA 1) - Truck crane oiler | was $46.08 |
| OPERATOR: Power Equipment (Cranes and Attachments - AREA 1) - Oiler | was $42.83 |
| OPERATOR: Power Equipment (Cranes and Attachments - AREA 1) - Truck crane oiler | was $45.07 |
| OPERATOR: Power Equipment (Cranes and Attachments - AREA 1) - Oiler | was $42.55 |
| OPERATOR: Power Equipment (Cranes and Attachments - AREA 1) - Truck crane oiler | was $44.83 |
| OPERATOR: Power Equipment (Steel Erection - AREA 1) - Oiler | was $43.72 |
| OPERATOR: Power Equipment (Steel Erection - AREA 1) - Truck Crane Oiler | was $45.95 |
| OPERATOR: Power Equipment (Steel Erection - AREA 1) - Oiler | was $43.45 |
| OPERATOR: Power Equipment (Steel Erection - AREA 1) - Truck Crane Oiler | was $45.73 |
| OPERATOR: Power Equipment (Steel Erection - AREA 1) - Hydraulic | was $45.07 |
| OPERATOR: Power Equipment (Steel Erection - AREA 1) - Oiler | was $43.23 |
| OPERATOR: Power Equipment (Steel Erection - AREA 1) - Truck Crane Oiler | was $45.46 |
| LABORER (GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS) - (1) New Construction | was $37.90 |
| LABORER (GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS) - (2) Establishment Warranty Period | was $31.59 |
| LABORER (CONSTRUCTION CRAFT LABORERS - AREA A) - GROUP 1-f | was $31.37 |
| LABORER (GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A) - (1) New Construction | was $36.25 |
| LABORER (GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A) - (2) Establishment Warranty Period | was $29.94 |
| LABORER (GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B) - (1) New Construction | was $35.25 |
| LABORER (GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B) - (2) Establishment Warranty Period | was $28.94 |
| LABORER (GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A) - (1) New Construction | was $36.25 |
| LABORER (GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A) - (2) Establishment Warranty Period | was $29.94 |
| LABORER (GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B) - (1) New Construction | was $35.25 |
| LABORER (GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B) - (2) Establishment Warranty Period | was $28.94 |
| LABORER (GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A) - (1) New Construction | was $36.25 |
| LABORER (GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A) - (2) Establishment Warranty Period | was $29.94 |
| LABORER (GARDENERS, HORTICULURAL & LANDSCAPE LABORERS - AREA A) - (1) New Construction | was $36.25 |
| LABORER (GARDENERS, HORTICULURAL & LANDSCAPE LABORERS - AREA A) - (2) Establishment Warranty Period | was $29.94 |
| Plasterer tender | was $41.93 |
| LABORER (GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B) - (1) New Construction | was $35.25 |
| LABORER (GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B) - (2) Establishment Warranty Period | was $28.94 |
| Plasterer tender | was $39.77 |
| PLUMBER, PIPEFITTER, STEAMFITTER - ALAMEDA COUNTY | was $80.50 |
| SHEET METAL WORKER - AREA 1: Mechanical Contracts under $200,000 | was $55.92 |
| SHEET METAL WORKER - All Other Work | was $64.06 |
| SHEET METAL WORKER - AREA 3 | was $55.16 |