CA20260017: rev 2 → rev 3
7 rate changes, 8 added, 6 removed.
Rate changes
Rates below include fringe (the full hourly package). Enter your remaining crew hours per classification to price this change for a job.
| Classification | Old total | New total | Δ/hr | Hours on job | Cost impact |
|---|---|---|---|---|---|
| ELECTRICIAN: DOES NOT INCLUDE FIRE ALARM, HOLD-UP ALARM, BURGLAR ALARM AND SURVEILLANCE SYSTEMS LOS ANGELES | $44.91 | $46.04 | +1.13 | — | |
| COMMUNICATIONS SYSTEM: INSTALLER COMMUNICATIONS AND SYSTEMS WORK (LOS ANGELES COUNTY) SCOPE OF WORK: INSTALLATION, TESTING, SERVICE AND MAINTENANCE OF SYSTEMS UTILIZING THE TRANSMISSION AND/OR TRANSFERENCE OF VOICE, SOUND, VISION AND DIGITAL FOR COMMERCIAL, EDUCATIONAL, SECURITY AND ENTERTAINMENT PURPOSES FOR THE FOLLOWING: TV MONITORING AND SURVEILLANCE, BACKGROUND - FOREGROUND MUSIC, INTERCOM AND TELEPHONE INTERCONNECT, MICROWAVE TRANSMISSION, MULTI-MEDIA, MULTIPLEX, NURSE CALL SYSTEMS, RADIO PAGE, BURGLAR ALARMS AND FIRE ALARMS. COMMUNICATION SYSTEMS THAT TRANSMIT OR RECEIVE INFORMATION AND/OR CONTROL SYSTEMS THAT ARE INTRINSIC TO THE ABOVE LISTED SYSTEMS; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, CONDUIT SYSTEMS, LINE VOLTAGE WORK, AND ENERGY MANAGEMENT SYSTEMS | $63.55 | $64.94 | +1.39 | — | |
| ELECTRICIANS (SANTA BARBARA COUNTY) WORK AT VANDENBERG AFB: $3.75 ADDITIONAL PER HOUR | $44.50 | $45.73 | +1.23 | — | |
| COMMUNICATIONS SYSTEM: INSTALLER COMMUNICATIONS AND SYSTEMS WORK (SANTA BARBARA COUNTY) SCOPE OF WORK: INSTALLATION, TESTING, SERVICE AND MAINTENANCE OF SYSTEMS UTILIZING THE TRANSMISSION AND/OR TRANSFERENCE OF VOICE, SOUND, VISION AND DIGITAL FOR COMMERCIAL, EDUCATIONAL, SECURITY AND ENTERTAINMENT PURPOSES FOR THE FOLLOWING: TV MONITORING AND SURVEILLANCE, BACKGROUND - FOREGROUND MUSIC, INTERCOM AND TELEPHONE INTERCONNECT, MICROWAVE TRANSMISSION, MULTI-MEDIA, MULTIPLEX, NURSE CALL SYSTEMS, RADIO PAGE, BURGLAR ALARMS AND FIRE ALARM (SEE LAST PARAGRAPH BELOW). INFORMATION AND/OR CONTROL SYSTEMS THAT ARE INTRINSIC TO THE ABOVE LISTED SYSTEMS; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, CONDUIT SYSTEMS, LINE VOLTAGE WORK, AND ENERGY MANAGEMENT SYSTEMS. FIRE ALARM WORK SHALL BE PERFORMED AT THE CURRENT INSIDE ELECTRICIAN TOTAL COST PACKAGE | $64.18 | $65.62 | +1.44 | — | |
| ELECTRICIAN (RIVERSIDE) | $88.37 | $90.09 | +1.72 | — | |
| COMMUNICATIONS SYSTEM: INSTALLER COMMUNICATIONS AND SYSTEMS WORK (RIVERSIDE AND SAN BERNARDINO COUNTIES) SCOPE OF WORK: INSTALLATION, TESTING, SERVICE AND MAINTENANCE OF SYSTEMS UTILIZING THE TRANSMISSION AND/OR TRANSFERENCE OF VOICE, SOUND, VISION AND DIGITAL FOR COMMERCIAL, EDUCATIONAL, SECURITY AND ENTERTAINMENT PURPOSES FOR THE FOLLOWING: TV MONITORING AND SURVEILLANCE, BACKGROUND - FOREGROUND MUSIC, INTERCOM AND TELEPHONE INTERCONNECT, MICROWAVE TRANSMISSION, MULTI-MEDIA, MULTIPLEX, NURSE CALL SYSTEMS, RADIO PAGE, BURGLAR ALARMS AND FIRE ALARMS. COMMUNICATION SYSTEMS THAT TRANSMIT OR RECEIVE INFORMATION AND/OR CONTROL SYSTEMS THAT ARE INTRINSIC TO THE ABOVE LISTED SYSTEMS; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, CONDUIT SYSTEMS, LINE VOLTAGE WORK, AND ENERGY MANAGEMENT SYSTEMS | $64.34 | $65.70 | +1.36 | — | |
| ELECTRICIAN (SAN BERNARDINO) | $46.07 | $47.20 | +1.13 | — |
Added classifications
| DRYWALL: STOCKER/SCRAPPER: (2) ALL OTHER WORK | $22.16 | $8.62 |
| DRYWALL: STOCKER/SCRAPPER: (1) WORK ON WOOD-FRAMED SINGLE FAMILY HOMES, AND WOOD-FRAMED APARTMENT BUILDINGS UP TO AND INCLUDING 4 STORIES | $22.16 | $8.62 |
| LABORERS: PLASTER TENDER (4 STORIES) WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL. WORK AT MILITARY BASES - $3.00 ADDITIONAL PER HOUR: CORONADO NAVAL AMPHIBIOUS BASE, FORT IRWIN, GEORGE AFB, MARINE CORPS AIR STATION-29 PALMS, IMPERIAL BEACH NAVAL AIR STATION, MARINE CORPS LOGISTICS SUPPLY BASE, MARINE CORPS PICKLE MEADOWS, FACILITY-SEELEY, NORTH ISLAND NAVAL AIR STATION, VANDENBERG AFB | $39.47 | $23.32 |
| LABORERS: PLASTER TENDER (1 TO 3 STORIES) WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL. WORK AT MILITARY BASES - $3.00 ADDITIONAL PER HOUR: CORONADO NAVAL AMPHIBIOUS BASE, FORT IRWIN, GEORGE AFB, MARINE CORPS AIR STATION-29 PALMS, IMPERIAL BEACH NAVAL AIR STATION, MARINE CORPS LOGISTICS SUPPLY BASE, MARINE CORPS PICKLE MEADOWS, MOUNTAIN WARFARE TRAINING CENTER, NAVAL AIR FACILITY-SEELEY, NORTH ISLAND NAVAL AIR STATION, VANDENBERG AFB | $39.47 | $23.32 |
| LABORERS: PLASTER CLEAN-UP LABORER (4 STORIES) WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL. WORK AT MILITARY BASES - $3.00 ADDITIONAL PER HOUR: CORONADO NAVAL AMPHIBIOUS BASE, FORT IRWIN, GEORGE AFB, MARINE CORPS AIR STATION-29 PALMS, IMPERIAL BEACH NAVAL AIR STATION, MARINE CORPS LOGISTICS SUPPLY BASE, MARINE CORPS PICKLE MEADOWS, MOUNTAIN WARFARE TRAINING CENTER, NAVAL AIR FACILITY-SEELEY, NORTH ISLAND NAVAL AIR STATION, VANDENBERG AFB | $36.92 | $23.32 |
| LABORERS: PLASTER CLEAN-UP LABORER (1 TO 3 STORIES) ADDITIONAL. WORK AT MILITARY BASES - $3.00 ADDITIONAL PER HOUR: CORONADO NAVAL AMPHIBIOUS BASE, FORT IRWIN, GEORGE AFB, MARINE CORPS AIR STATION-29 PALMS, IMPERIAL BEACH NAVAL AIR STATION, MARINE CORPS LOGISTICS SUPPLY BASE, MARINE CORPS PICKLE MEADOWS, MOUNTAIN WARFARE TRAINING CENTER, NAVAL AIR FACILITY-SEELEY, NORTH ISLAND NAVAL AIR STATION, VANDENBERG AFB | $36.92 | $23.32 |
| PAINTER, INCLUDING LEAD ABATEMENT: (3) JOURNEYMAN & INDUSTRIAL (SAN LUIS OBISPO, SANTA BARBARA & VENTURA) | $34.02 | $16.49 |
| PAINTER, INCLUDING LEAD ABATEMENT: (3) JOURNEYMAN & INDUSTRIAL (IMPERIAL, LOS ANGELES, ORANGE, RIVERSIDE & SAN BERNARDINO) | $34.02 | $16.49 |
Removed classifications
| Drywall - Stocker/Scrapper | was $22.16 |
| Laborers: (1 to 3 Stories) - Plaster Clean-Up Laborer | was $36.92 |
| Laborers: (1 to 3 Stories) - Plaster Tender | was $39.47 |
| Laborers: (4 Stories) - Plaster Clean-up Laborer | was $36.92 |
| Laborers: (4 Stories) - Plaster Tender | was $39.47 |
| PAINTER (including lead abatement) - (3) Journeyman & Industrial | was $34.02 |