CA20260007: rev 0 → rev 1
6 rate change(s), 0 added, 0 removed.
Rate changes
Rates below include fringe (the full hourly package). Enter your remaining crew hours per classification to price this change for a job.
| Classification | Old total | New total | Δ/hr | Hours on job | Cost impact |
|---|---|---|---|---|---|
| OPERATOR: Power Equipment (Steel Erection - AREA 1) - Oiler | $74.38 | $74.60 | +0.22 | — | |
| OPERATOR: Power Equipment (Steel Erection - AREA 1) - Truck Crane Oiler | $76.61 | $76.88 | +0.27 | — | |
| ELECTRICIAN | $66.28 | $68.88 | +2.60 | — | |
| PLUMBER | $91.59 | $94.14 | +2.55 | — | |
| PLUMBER | $94.74 | $97.19 | +2.45 | — | |
| SPRINKLER FITTER (Fire Sprinklers) | $122.54 | $122.89 | +0.35 | — |