Heavy construction wages: Navajo + 3 more counties, Arizona
Wage determination AZ20260054 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/AZ20260054 on · latest revision 1 · verify at sam.gov/wage-determination/AZ20260054/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $33.00 | $13.04 | $46.04 |
| ELECTRICIAN: LINEPERSON | $62.08 | $22.49 | $84.57 |
| ELECTRICIAN: GROUNDPERSON | $36.00 | $16.88 | $52.88 |
| ELECTRICIAN: LINE EQUIPMENT OPERATOR | $46.56 | $19.15 | $65.71 |
| POWER EQUIPMENT OPERATOR: CRANE/DERRICK | $36.64 | $18.12 | $54.76 |
| POWER EQUIPMENT OPERATOR: LOADER/FRONT END LOADER | $35.56 | $18.12 | $53.68 |
| TRUCK DRIVER: HYDROVAC | $32.29 | $18.12 | $50.41 |
| LABORER: GENERAL | $27.41 | $9.26 | $36.67 |
| LABORER: JACKHAMMER | $29.05 | $9.26 | $38.31 |
| LABORER: PIPELAYER | $29.91 | $9.26 | $39.17 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $30.88 | $9.26 | $40.14 |
| LABORER: MASON TENDER | $27.41 | $9.26 | $36.67 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $29.05 | $9.26 | $38.31 |
| LABORER: GRADE SETTER | $29.91 | $9.26 | $39.17 |
| TRUCK DRIVER: CONCRETE | $30.88 | $9.26 | $40.14 |
| TRUCK DRIVER: DUMP | $30.88 | $9.26 | $40.14 |
| TRUCK DRIVER: WATER | $30.88 | $9.26 | $40.14 |
| LABORER: FENCE ERECTOR | $27.41 | $9.26 | $36.67 |
| CARPENTER: FORMWORK CONCRETE | $31.98 | $9.26 | $41.24 |
| PIPEFITTER-STEAMFITTER | $54.15 | $19.80 | $73.95 |
| POWER EQUIPMENT OPERATOR: BACKHOE/BACKHOE & LOADER COMBO/TRACK BACKHOE | $27.38 | $0.00 | $27.38 |