Building construction wages: Pima, Arizona
Wage determination AZ20260040 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/AZ20260040 on · latest revision 1 · verify at sam.gov/wage-determination/AZ20260040/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | $32.29 | $9.97 | $42.26 |
| CARPENTER | $33.19 | $19.20 | $52.39 |
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING) | $33.00 | $13.04 | $46.04 |
| POWER EQUIPMENT OPERATOR: CRANE | $36.04 | $13.52 | $49.56 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $31.69 | $13.52 | $45.21 |
| IRONWORKER, STRUCTURAL | $33.00 | $19.91 | $52.91 |
| PIPEFITTER | $51.15 | $21.00 | $72.15 |
| SHEET METAL WORKER | $49.39 | $19.86 | $69.25 |
| TILE SETTER | $21.50 | $0.00 | $21.50 |
| PLUMBER | $28.51 | $0.00 | $28.51 |
| PAINTER | $15.00 | $0.00 | $15.00 |
| OPERATOR: ROLLER | $23.62 | $6.44 | $30.06 |
| OPERATOR: LOADER | $15.00 | $4.15 | $19.15 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $19.58 | $3.79 | $23.37 |
| LABORER: PIPELAYER | $16.77 | $1.05 | $17.82 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $19.79 | $0.00 | $19.79 |
| LABORER: COMMON OR GENERAL | $17.46 | $0.00 | $17.46 |
| IRONWORKER, REINFORCING | $22.04 | $0.00 | $22.04 |
| ELECTRICIAN (LOW VOLTAGE WIRING) | $26.16 | $9.91 | $36.07 |
| DRYWALL FINISHER/TAPER | $22.47 | $0.00 | $22.47 |
| CEMENT MASON/CONCRETE FINISHER | $21.00 | $0.00 | $21.00 |