| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: SEMI/TRAILER TRUCK | $10.75 | $0.00 | $10.75 |
| TRUCK DRIVER: WATER TRUCK | $16.09 | $0.00 | $16.09 |
| TRUCK DRIVER: LOWBOY TRUCK | $17.74 | $0.00 | $17.74 |
| TRUCK DRIVER: FLATBED TRUCK | $12.75 | $0.00 | $12.75 |
| TRUCK DRIVER: DUMP TRUCK | $16.64 | $0.00 | $16.64 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $10.97 | $0.00 | $10.97 |
| TRAFFIC CONTROL: FLAGGER | $11.76 | $0.00 | $11.76 |
| PILEDRIVERMAN | $18.75 | $0.00 | $18.75 |
| OPERATOR: TRACTOR | $18.31 | $0.00 | $18.31 |
| OPERATOR: SCREED | $15.91 | $0.00 | $15.91 |
| OPERATOR: SCRAPER | $17.78 | $0.00 | $17.78 |
| OPERATOR: ROLLER | $15.48 | $0.00 | $15.48 |
| OPERATOR: POST DRIVER (GUARDRAIL/FENCES) | $19.30 | $0.00 | $19.30 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $16.31 | $0.00 | $16.31 |
| OPERATOR: OILER | $16.06 | $0.00 | $16.06 |
| OPERATOR: MILLING MACHINE | $20.95 | $0.00 | $20.95 |
| OPERATOR: MECHANIC | $22.42 | $0.00 | $22.42 |
| OPERATOR: LOADER | $13.77 | $0.00 | $13.77 |
| OPERATOR: GRADER/BLADE | $19.75 | $0.00 | $19.75 |
| OPERATOR: GRADE CHECKER | $19.30 | $0.00 | $19.30 |
| OPERATOR: CRANE | $25.21 | $0.00 | $25.21 |
| OPERATOR: BULLDOZER | $18.25 | $0.00 | $18.25 |
| OPERATOR: BROOM/SWEEPER | $14.94 | $0.00 | $14.94 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $19.49 | $0.00 | $19.49 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $15.00 | $0.00 | $15.00 |
| OPERATOR: ASPHALT PLANT | $17.67 | $0.00 | $17.67 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $11.51 | $0.00 | $11.51 |
| LABORER: COMMON OR GENERAL | $13.92 | $0.00 | $13.92 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $12.95 | $0.00 | $12.95 |
| IRONWORKER, STRUCTURAL | $20.95 | $9.26 | $30.21 |
| IRONWORKER, REINFORCING | $15.80 | $0.00 | $15.80 |
| INSTALLER - GUARDRAIL | $15.80 | $0.00 | $15.80 |
| HIGHWAY/PARKING LOT STRIPING: OPERATOR (STRIPING MACHINE) | $13.50 | $0.00 | $13.50 |
| FENCE ERECTOR | $11.80 | $0.00 | $11.80 |
| CEMENT MASON/CONCRETE FINISHER | $14.73 | $0.00 | $14.73 |
| CARPENTER, EXCLUDES FORM WORK | $15.92 | $0.00 | $15.92 |
| CARPENTER (FORM WORK ONLY) | $18.87 | $0.00 | $18.87 |